Similar Projects
Lake Lancaster to Lake Davis Drainage Improvement
Infrastructure
Bidding
$915,000 est. value
Orlando, FL 32806

Drainage Improvements
Infrastructure
Bidding
FL

Underdrains Installation and Repairs
Post-Bid
Less than $6,771,550 est. value
FL

Andover Lakes Subdivision Underdrain Installation
Post-Bid
$1,699,115 est. value
FL

Fuel Island Drain Installation
Results
Orlando, FL 32801

Countywide Restoration of Shoulders and Ditches
Term Contract
Results
Less than $5,121,550 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Culvert Desilting and Shotcrete Repairs
Results
Less than $253,725 est. value
FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

Forest Street Outfall Improvements
Infrastructure
Post-Bid
Windermere, FL 34786

Retention Pond Cleaning and Reshaping
Results
Less than $180,000 est. value
FL

Drainage Repair
Results
Less than $670,500 est. value

SR 417 Pond Modifications North of Barry Dease Road and SR 528 and SR 417 Guardrail Upgrades
Results
Orlando, FL 32807

Drainage Repair
Results
Less than $1,101,000 est. value

Last Updated 01/03/2022 03:23 AM
Project Title

Parks Cady Way Trail Drainage Improvements

Physical Address View project details and contacts
City, State (County) Winter Park, FL 32792   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $58,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Drainage Improvements to regrade existing swales to address the poor drainage associated with ineffective grading and sediment accumulation that has developed over time along the corridor, particularly the 0.5-mile portion of the trail that is located between the Crane Strand Canal and N Palmetto Avenue. Additionally, installation of rip rap, and manhole structure to address washout area just west of Forsyth Road.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents