Similar Projects
SBR General Painting Services - Camden Yards Sports Complex (CYSC)
Alteration
Bidding
Baltimore, MD 21201

Time and Material Carpentry and Painting Services
Term Contract
Post-Bid
Rockville, MD

Maryland School for the Deaf Benson Gym Ceiling Painting Project
Post-Bid
$100,000 to $500,000 est. value
Frederick, MD

Exterior Parging, Center School Building, Fair Hill NRMA
Results
Less than $50,000 est. value
Elkton, MD 21921

Bridge Preservation County Wide X
Results
$500,001 to $1,000,000 est. value
Rockville, MD 20847

Painting of Ely Auditorium
Post-Bid
Frederick, MD 21701

Leonardtown High School Media Center Interior Painting
Results
Leonardtown, MD 20650

Painting of Ely Auditorium
Post-Bid
Columbia, MD

Interior Painting of Common Areas at Fifth Regiment Armory
Results
$100,000 to $500,000 est. value
Baltimore, MD 21201

Pool White Coat Renewal, Physical Education Building, Rockville Campus
Post-Bid
Rockville, MD

Airport Runway and Taxiway Painting
Alteration
Results
Salisbury, MD

Power Wash and Paint Office Building
Post-Bid
Westover, MD 21871

Emergency Operations Center Exterior Painting
Alteration
Results
McHenry, MD 21541

On-Call Structural Steel Painting Services
Post-Bid
Baltimore, MD

Fire Hydrant Painting Services
Term Contract
Results
Laurel, MD

Reported 07/16/2022 12:00 AM
Project Title

Elevated Storage Tank Painting

Physical Address View project details and contacts
City, State (County) Perry Point, MD 21902   (Cecil County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Goal - DVBE(100%). This project is to prepare and paint the existing 500,000-gallon elevated domestic water storage tank at the Perry Point VAMC, Avenue D, Perry Point MD 21902. The contractor shall furnish all labor, tools, materials, equipment, supplies, and supervision to perform work as described in the statement of work and as required by the contract drawings and specifications. This contract will prepare and paint the existing 500,000 gallon elevated domestic water storage tank, as well as make minor piping and system configuration improvements in accordance with the Statement of Work (SOW) and specifications attached hereto.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents