Similar Projects
Berth 46 - Outer Harbor Cruise Terminal AMP - Port of Los Angeles
Infrastructure
Conception
$35,000,000 est. value
Los Angeles, CA

Pump Station 2.4 Installation - City of Brentwood
Infrastructure
Conception
Brentwood, CA 94513

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Removal and Transport of Grit, Scum/Sludge, and Storm Water
Infrastructure
Bidding
San Diego, CA

Bon Air Road Bridge Replacement Offsite Mitigation Projects
Infrastructure
Bidding
$2,500,000 to $2,800,000 est. value
Larkspur, CA 94939

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Operation and Maintenance Services of Sewer and Water Systems in County Service Area (Csa) R-1967-1 Castlewood
Alteration
Post-Bid
CA

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Upcoming RFP: Canal Maintenance Program CEQA and Permitting Support
Term Contract
Conception
San Jose, CA

Fort Baker Sewer and Manhole
Term Contract
Design
Mill Valley, CA 94941

Panther Gap Road PM 0.50 Storm Damage Repair Project
Infrastructure
Bidding
$4,895,255 est. value
CA

Harbor Bay Isle Lagoon Improvements Project
Infrastructure
Post-Bid
$250,000 est. value
Alameda, CA 94502

Gold Flat Campground Upgrades
Renovation
Results
$700,000 to $1,100,000 est. value
Oroville, CA 95966

Last Updated 06/30/2022 12:55 AM
Project Title

Paper Mill Creek Storm Drain Inlet Upgrades

Physical Address View project details and contacts
City, State (County) Novato, CA 94949   (Marin County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $362,100
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project work shall include, but is not limited to, the following: Culvert 1, Swale Riser Inlet 1, Swale Riser Inlet 2, and Culvert 2 General: Mobilization and demobilization, construction staking, and temporary facilities and controls, site preparation and demolition, and site restoration and rehabilitation. Culvert 1 Removal and Improvements (Sta 2+00 to Sta 2+25): Removal: Demo/Remove the existing items: culvert inlet structure, 16 LF of 42" RCP culvert, junction box/inlet structure, 14 LF of 36" RCP, and 14 LF of 15" RCP. Improvements: Construct culvert headwall, wingwall, apron. Connect new 4 LF 42" RCP pipe to existing with one (1) cast in place concrete collar. Excavate and backfill around culvert headwall, wingwall, and apron as shown on plans. Connect the following items in newly constructed culvert inlet: 10 LF 36" diameter RCP with two (2) cast in place concrete collars, 6 LF 15" diameter RCP with two (2) cast in place concrete collars. Install galvanized steel bollards on culvert apron. Install galvanized steel debris rack on culvert inlet. Swale Riser Inlet 1 Replacement and Improvements (Sta 3+91.5 to Sta 4+36.25): Removal: Demo/Remove existing steel pyramid riser inlet. Improvements: Install new galvanized steel riser inlet to existing concrete foundation. Construct earthen check dam structure. Construct right bank berm improvements. Swale Riser Inlet 2 Replacement and Improvements (Sta 5+58 to Sta 6+11): Removal: Demo/Remove existing steel pyramid riser inlet. Improvements: Install new galvanized steel riser inlet to existing concrete foundation. Construct right bank berm improvements. Culvert 2 Improvements (Sta 9+03.25 to Sta 9+39.25): Removal: Demo/Remove 4 LF of 42" RCP culvert. Improvements: Construct culvert headwall, wingwall, and apron. Connect new 4 LF 42" RCP pipe to existing with one (1) cast in place concrete collar. Excavate and backfill around culvert headwall, wingwall, and apron as shown on plans. Install galvanized steel safety railing along top of culvert headwall.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents