Similar Projects
J045--Boiler Life Expectancy and Damage Assessment Inspection
Bidding
Columbia, SC 29209

HVAC and Electrical Services
Term Contract
Post-Bid

Adjutant General Water Heater Replacement
Post-Bid
$63,000 to $73,000 est. value
Columbia, SC

HVAC Maintenance and Repair Services
Term Contract
Results
Columbia, SC

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

20 Ton Indoor Handler Unit
Post-Bid
Columbia, SC

J--Water Treatment Boiler and Chiller Plant SDVOSB or VOSB Set-Aside _ Dependent Upon Responses Received
Results
Columbia, SC

Aerco Wizard Steam Fired Water Heater
Post-Bid
Columbia, SC 29210

Tucker Center Chiller Replacement Project
Results
$700,000 to $922,000 est. value
Columbia, SC 29203

Make Up Air Unit
Post-Bid
Columbia, SC 29210

J--Air Handler Filter Service
Results
Columbia, SC 29209

Sims/Aycock Building - Replace Control Valves
Post-Bid
$45,000 to $55,000 est. value
Columbia, SC 29201

Monitoring and Controls of Two (2) Air Handling Units
Results
Columbia, SC 29201

SC DMH Midlands Center Multizone HVAC Unit Replacement
Post-Bid
$200,000 to $240,000 est. value
Columbia, SC 29203

McAdams Hall Duct Cleaning
Results
Less than $19,440 est. value
Columbia, SC

Last Updated 05/04/2020 03:43 PM
Project Title

Gressette Building Combined Mechanical Projects

Physical Address View project details and contacts
City, State (County) Columbia, SC   (Richland County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $656,222
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace chilled water infrastructure and Multizone unit in basement mechanical room. This includes chilled water pumps, air separator, piping, variable frequency drives, associated DDC controls, valves, controls, some ductwork and insulation. New heating water isolation valves to be installed at each floor. Replace all hot, cold and hot water recirc piping in building. New chase and minor wall ceiling replacement as needed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents