Similar Projects
Water Main Replacement
Design
Elmwood Park, IL

30-Inch Transmission Main Rehabilitation
Infrastructure
Bidding
Evanston, IL

Water Main at Mile Long Bridge
Infrastructure
Bidding
IL

Term Agreement for Water Main Construction - District Two
Term Contract
Post-Bid
Chicago, IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

Water Main Installation
Infrastructure
Bidding
Chicago, IL

Water Supply Leak Detection Survey
Post-Bid
Park Ridge, IL 60068

Term Agreement for Water Main Construction - District Three
Term Contract
Results
Chicago, IL

Water Meter Upgrade
Infrastructure
Bidding
Brookfield, IL

Basement Water Main Pipe
Renovation
Post-Bid
Park Forest, IL 60466

Term Agreement for Water Main Construction - District One
Term Contract
Results
Chicago, IL

On-Call Emergency And Routine Water System Repair Services
Post-Bid
Broadview, Westchester, IL 60155

Water Main Construction - District 4 (Project 20-604)
Term Contract
Results
Chicago, IL

Last Updated 09/21/2021 07:48 AM
Project Title

Jordan Community Elementary School - Two Pipe System Insulation Replacement

Physical Address View project details and contacts
City, State (County) Chicago, IL 60626   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All Insulation of the Two Pipe System is Soaked with Water and Extremely Moldy. 1. Found System to Have Air Vents Installed Throughout and Vents are Not Insulated. This has Caused Vents and Vent Piping to Condensate when Running Chilled Water Through the Piping System. 2. These Air Vents Have Been Condensating and Soaking Insulation Since the First Time the Chiller Was Run Through the Piping, Approximately 30 Years Ago. 3. All Insulation is Now Moldy and Should be Replaced. 4. Approximate Measurements of Replacements are: 5. Remove and Replace Approximately 1500' of 2" Pipe Insulation. 6. Remove and Replace Approximately 400' of 3/4" Pipe Insulation.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents