Similar Projects
HVAC Improvements Worcester Regional Airport (ORH) - General Bids
Bidding
Less than $1,650,000 est. value
Worcester, MA 01602

Contractor to Provide Preventive Maintenance and Service to Various HVAC Equipment
Bidding
Less than $39,000 est. value
Westborough, MA

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Heating, Ventilation and Cooling Maintenance Service
Term Contract
Post-Bid
Winchendon, MA 01475

Butterick Building HVAC
Results
Less than $400,000 est. value
Sterling, MA

Elmwood A/C Chiller Rebuild and Inspection
Results
Less than $45,000 est. value
Millbury, MA

Service and Maintenance for all "Mini Split" Systems throughout the Worcester Housing Authority's Portfolio
Term Contract
Post-Bid
Worcester, MA 01605

Phase II Electrical Upgrades - Sub Bids
Results
$1,500,000 est. value
Southbridge, MA

J--Plumbing and Pipefitting BOA
Post-Bid

Kitchen Exhaust Cleaning and Inspection/WPS
Term Contract
Results
Worcester, MA

Installation of A Mitsubishi Cooling and Heat Pump System
Post-Bid
$10,000 est. value
Lunenburg, MA

Minor Plumbing Services 2019 (School Department)
Results
$150,000 est. value
Leominster, MA 01453

Smart Burners
Post-Bid
Worcester, MA

HVAC Annual Maintenance 2019 (School Department)
Results
Leominster, MA

Cooling Tower Replacement @ Souza Baranowski Correctional Center
Post-Bid
$300,000 est. value
Lancaster, MA

Last Updated 02/18/2019 08:55 AM
Project Title

Window / Door / Boiler Replacement, John F. Kennedy Elementary School, MSBA Accelerated Repair - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Blackstone, MA   (Worcester County)
Category(s) Single Trades
Sub-Category(s) HVAC, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,780,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required. The Project consists of: Removal and Replacement of existing Windows, Doors and Unit Ventilators.
Details
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents