Similar Projects
Fire Training Tower System Equipment Upgrade
Alteration
Bidding
Salt Lake City, UT 84104

Fire Detection and Suppression Systems at Various Locations
Alteration
Bidding
Ogden, UT

GTI Annex, Fire Sprinkler Project
Post-Bid
Salt Lake City, UT 84115

Fire Sprinkler and Fire Suppression Services
Term Contract
Post-Bid
Salt Lake City, UT

Construction: Westbrook Elementary, Fire Alarm Upgrade
Results
Less than $100,000 est. value
Taylorsville, UT 84129

S202--Fire Alarm and Fire Suppression Systems Testing, Inspection and Maintenance Services
Results
Salt Lake City, UT

Southwest Technical College Student Services Remodel
Renovation, Term Contract
Post-Bid
Cedar City, UT 84720

DFCM Construction-Pre-Qualified Electrical Contractors-Davis Technical College Fire Alarm
Results
Less than $130,500 est. value
Kaysville, UT 84037

Maintain Fire Suppression Systems
Term Contract
Post-Bid
Salt Lake City, UT 84116

RRC (GFSB) Fire Alarm System Upgrades
Results
Less than $65,000 est. value
Salt Lake City, UT

HOVE Maint VC Fire Suppression System
Term Contract
Post-Bid
Montezuma Creek, UT 84534

DFCM Construction-Pre-Qualified Electrical Contractors-Ogden Regional Center Fire Alarm
Results
$204,392 est. value
Ogden, UT

River Heights Elementary Fire Alarm Upgrades
Alteration
Post-Bid
River Heights, UT

Alpine School District Fire Alarm Services Contract
Results
American Fork, UT

Fire Alarm Receiver Upgrade
Term Contract
Post-Bid
Salt Lake City, UT

Last Updated 03/30/2022 11:34 AM
Project Title

Annual Contract for Maintenance of Fire Sprinkler Systems

Physical Address View project details and contacts
City, State (County) Granite, UT   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Current GSD sprinkler systems: 21 ELEMENTARY SCHOOLS 1. 32 Systems 2. 18 Antifreeze Loops 9 JUNIOR HIGH SCHOOLS 1. 19 Systems. 2. 28 Antifreeze Loops. 3. 6 Control Valves. 8 HIGH SCHOOLS 1. 22 Systems. 2. 5 Antifreeze Loops. 3. 1 Fire Pump-Granger High. 6 MISCELLANEOUS BUILDINGS: (Warehouse, Paint Shop, Hartvigsen & Granite Education Center) 1. 8 Systems. 2. 3 Antifreeze Loops. 3. 6 Control Valves. 4. 1 Fire Pump-GEC.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents