Similar Projects
Holt Fire Station
New Construction
Conception
$813,000 est. value
Holt, FL

Longwood Fire Station 15/Public Safety Facility
New Construction
Conception
Longwood, FL

New Police Facility
New Construction
Design
Tallahassee, FL

Fire Station 11
New Construction
Design
Orlando, FL

Fire Station No. 2
New Construction - 87,619 SF
Bidding
Fernandina Beach, FL 32034

Tyndall AFB Fire Station
New Construction
Bidding
Tyndall AFB, FL

Cocoa Beach Police Headquarters
New Construction - 28,900 SF
Post-Bid
Less than $8,500,000 est. value
Cocoa Beach, FL

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

Consultant Services for a New Police Headquarters
New Construction - 225,000 SF
Results
Fort Lauderdale, FL 33301

Construction Manager at Risk for the Austin Tindall Fire Station
Results
Kissimmee, FL 34741

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Winter Haven Fire Station No. 3 / Public Safety Facility
New Construction
Construction
Winter Haven, FL

Fire Station 17 and Community Resilience Center
New Construction
Conception
Tallahassee, FL 32310

Orlando Fire Station 6
New Construction
Design
Orlando, FL

Construction Manager at Risk for County Fire and Emergency Medical Stations
New Construction
Bidding
$12,000,000 est. value
Alachua, Gainesville, FL 32607

Reported 10/29/2021 12:00 AM
Project Title

Fire Station 45 - Bunk Room Addition

Physical Address View project details and contacts
City, State (County) Delray Beach, FL 33446   (Palm Beach County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The addition of 775 square feet to an existing one (1) story Fire Station to include; a total of 10 sleeping rooms (bunk rooms), an extended weight room, new lighting, new signage in renovated/added areas, reconfiguration of mechanical ductwork, modifications to the fire sprinkler system and intrusion alarm systems, tie-in of the new addition into the existing generator, modification to existing CCTV for building, modification to existing fire alarm, new parking stalls, revisions to the existing drainage system and new foundation landscaping

Details

Fire/Police Station, Addition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents