Similar Projects
Construction Services for the Martin County Septic to Sewer Conversion Program
Results
Less than $35,000,000 est. value
Stuart, FL 34996

High Point Subdivision Water Main Replacement
Results
Less than $900,000 est. value
Stuart, FL 34996

Maintenance, Repair and Install of Plumbing Systems and Lift Stations-Along Florida's Turnpike System
Results

Water Meter Installation
Term Contract
Results
Less than $1,000,000 est. value
Stuart, FL 34996

Sewall`s Point Area Septic to Sewer Conversion
Results
Stuart, FL 34996

Magnolia Bluff Force Main Extension
Results
Less than $275,000 est. value
Stuart, FL 34996

Indian River Drive Water Main and Force Main Extension
Results
Less than $1,044,000 est. value
Jensen Beach, FL

South Sewall's Point Road Phase 1
Results
$2,915,034 est. value
Sewall's Point, FL 34996

Indian River Drive Water Main Improvement Phase 2
Results
$450,000 est. value
Hobe Sound, FL 33455

Monterey Road Subdivision Watermain Improvements Project
Results
$800,000 est. value
Stuart, FL 34994

Tropical Farms Floridan Wells TFRO 6 and TFRO 7 Raw Watermain Addition
Results
$2,000,000 est. value
FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Golden Gate Septic to Sewer Improvements
Results
Less than $17,250,000 est. value
Stuart, FL 34996

Port Salerno - New Monrovia Water Main Extension
Results
Stuart, FL 34994

Grinder Station Installation and Septic Conversion (Secondary Contractor)
Term Contract
Results
Less than $1,500,000 est. value
Stuart, FL 34996

Last Updated 04/29/2021 01:04 PM
Project Title

SMRU Gomez Corridor Water System and Low Pressure Sewer System

Physical Address View project details and contacts
City, State (County) Hobe Sound, FL 33455   (Martin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of approximately 7,770 linear feet of new 6-inch HDPE Water Main pipe via horizontal directional drill methods, along with approximately 820 LF of 6” PVC water main via open cut. The work will include the installation of water valves, 21 fire hydrants, and the installation of all new PE water services for existing customers. The existing 4,600 linear feet of 4 to 6-inch water main will be grouted in place and abandoned, while the 2 to 3-inch water main will be cut, capped and abandoned in place. The construction of approximately 16,710 linear feet of new 2 to 4-inch HDPE low pressure force main pipe via horizontal directional drill methods, along with approximately 630 linear feet of 2 to 4-inch PVC low pressure force main via open cut, and the rehabilitation of the terminal lift station

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents