Similar Projects
Investigate and Repair Facades at Gleeson and Laffin Halls
Bidding
$1,000,000 to $2,500,000 est. value
Farmingdale, NY 11735

Awosting Hall and Mohonk Hall Rehabilitation and Upper Floor Addition at SUNY New Paltz
Renovation, Addition
Sub-Bidding
New Paltz, NY

Dyson Center
Renovation, Addition - 107,437 SF
Post-Bid
$40,000,000 est. value
Poughkeepsie, NY 12601

Baker Lab Roof Replacement
Renovation
Post-Bid
$200,000 to $230,000 est. value
Ithaca, NY 14882

New Pharmacy School Facility Renovation at Binghamton University
Renovation
Results
Binghamton, NY

Cleveland Hall Renovation
Renovation
Results
Less than $7,700,000 est. value
Binghamton, NY 13902

Construct New Emergency Services Building at SUNY Oneonta
New Construction - 9,000 SF
Construction
$5,000,000 to $10,000,000 est. value
Oneonta, NY 13820

Reconstruct Central Heating Plant at Buffalo State College
Construction
$10,000,000 to $15,000,000 est. value
Buffalo, NY 13903

Renovate Houghton Hall - Math Fitout at SUNY Fredonia
Renovation
Post-Bid
$2,500,000 to $5,000,000 est. value
Fredonia, NY 14063

Hinman Dining Hall Renovation, Addition and Boiler Replacement
Renovation, Addition
Results
Binghamton, NY 13902

Maria College Campus Development
Renovation, Addition - 1,120 SF
Construction
$5,000,000 est. value
Albany, NY 12208

Academic Restroom Upgrades Project - Phase 1
Term Contract
Post-Bid
Harrison, NY 10577

Construction Management Services for Monroe Community College Finger Lakes Workforce Development Center
Results
Rochester, NY 14614

Syracuse University Link Hall Room 019 Laboratory
Renovation, Addition
Construction
Syracuse, NY 13202

Erie Community College City Campus 2018 Various ADA Upgrades
Post-Bid
Buffalo, NY 14203

Last Updated 01/19/2022 01:42 AM
Project Title

Studio A Renovation at SUNY Purchase

Physical Address View project details and contacts
City, State (County) Purchase, NY 10577   (Westchester County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The main features of the work shall include, but not be limited to the following: A full renovation of the main recording studio (Studio A) in the Music Building. Studio A is roughly 1,300 square feet and is divided into a recording space and teaching/control room space.

Details

College/University, Approximately 1,300 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents