Similar Projects
Water Storage Distribution System (WSDS)
Post-Bid
Detroit, MI

Underground Storage Tank Assessment and Recommendation Services
Infrastructure
Post-Bid
Detroit, MI

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Calcium Chloride Tanks - St Ignace Garage, L'Anse Garage
Infrastructure
Post-Bid
MI

World-Wide Water Storage Tank Remediation
Term Contract
Results

Storage Tank Inspection and Maintenance Services
Term Contract
Post-Bid
Clinton Township, Inkster, Troy, MI 48035

South Water Tower
Results
$232,000 est. value
Mason, MI 48854

Meridian Township Water Tower Contract 2022
Infrastructure
Post-Bid
$180,000 est. value
Okemos, MI

UST Removal and Site Remediation
Results
Detroit, MI 48213

Taylor Meadows Water Heater and Storage Tanks
Infrastructure, Alteration
Results
Taylor, MI 48180

UST Removal and Installation
Infrastructure
Results
Midland, MI 48640

Double Wall Storage Tanks - ESG SPC 5000
Infrastructure
Results

Millennium Park AST
Infrastructure
Results
Walker, MI 49534

Improvements and Tank Painting at KNAPP, LEONARD, and CAMBRIDGE TANKS.
Alteration
Results
$570,000 est. value
Grand Rapids, MI

Last Updated 01/10/2022 11:37 PM
Project Title

Dmva Ust-Ast Services

Physical Address View project details and contacts
City, State (County) Bay City, Lansing, Midland, Taylor, Wyoming, MI (Bay, Ingham, Kent, Midland, Wayne Counties)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor will perform onsite inspections quarterly for these locations: UST Sites: Camp Grayling – MATES 2 – 7,000 gallon each Camp Grayling Cantonment – 2 – 6,000 gallon each Detroit Olympia MVS – 1 – 5,000 gallons, 1 – 1,500 gallons Montague MVS – 1 – 3,000 gallons, 1 – 4,000 gallons Grand Ledge Aviation Support Facility – 1 – 30,000 gallons Fort Custer Training Center UTES – 2 – 10,000 gallons Grand Rapids Home for Veterans – 1 – 8,000 gallons AST Sites: Lansing JFHQ/CSMS – 1 – 10,000 gallons Midland Armory – 1 – 10,000 gallons Taylor Armory – 1 – 10,000 gallons Washtenaw Armory – 1 – 10,000 gallons Sault Ste. Marie Armory – 1 – 10,000 gallons Bay City Armory – 1 – 10,000 gallons Wyoming Armory – 1 – 10,000 gallons

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents