Last Updated | 01/31/2023 05:08 AM |
Project Title | WSH-Building 29, Treatment and Recovery Center Addition and Remodel |
Physical Address | View project details and contacts |
City, State (County) | Olympia, WA 98501 (Thurston County) |
Category(s) | Heavy and Highway, Medical |
Sub-Category(s) | Hospital, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $18,147,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | SUBCONTRACTOR LISTINGS: For bid proposals exceeding $1M, each bidder shall submit: Form A (HVAC, Plumbing, and Electrical) with its bid proposal or within one hour after the bid submittal time/date. Form B (Structural Steel Install, Rebar Install) within 48 hours after the bid submittal time/date. Forms A and B must be emailed to: FPSsubcontractorlist@des.wa.gov.FPS will be accepting mailed-in or hand-delivered bids. Clearly identify that it is a SEALED BID on the outside of the envelope. Include an attention line in the address to ensure that the bid is routed correctly. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary workforce diversity goals for this apprentice participation are identified in the Instructions to Bidders and the General Conditions for Washington State Facility Construction. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. In accordance with RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder is required to provide the names of the Subcontractors with whom the Bidder will directly subcontract for the performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical for this project on Subcontractor List Form A within one hour of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. The Bidder shall also provide names of the Subcontractors with whom the Bidder will subcontract for structural steel installation and rebar installation on Subcontractor List Form B within 48 hours of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. Supplemental Bidder Responsibility will be evaluated for this project. In determining Bidder responsibility, the Owner shall consider an overall accounting of the criteria set forth in "DIVISION 00 SUPPLEMENTAL RESPONSIBILITY CRITERIA". Please direct questions regarding this subject to the office of the Consultant. If you have questions, please contact us at EASMail@des.wa.gov or call (360) 902-7272 (voice message only). The successful Bidder is required to register and create an account in the DES Diversity Compliance program (B2Gnow) at https://des.diversitycompliance.com. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. Please direct questions regarding this project to the office of the Consultant NAC|Architecture; 2025 First Avenue, Suite 300, Seattle, WA 98121, 206-441-4522. The State reserves the right to accept or reject any or all bids and to waive informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |