Similar Projects
Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

Pump Station 2.4 Installation - City of Brentwood
Infrastructure
Conception
Brentwood, CA 94513

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Removal and Transport of Grit, Scum/Sludge, and Storm Water
Infrastructure
Bidding
San Diego, CA

Bon Air Road Bridge Replacement Offsite Mitigation Projects
Infrastructure
Bidding
$2,500,000 to $2,800,000 est. value
Larkspur, CA 94939

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Sub-basin BD Drainage Ditch - 50280 - City of Chico
Infrastructure
Conception
Less than $266,845 est. value
Chico, CA 95927

Fort Baker Sewer and Manhole
Term Contract
Design
Mill Valley, CA 94941

Panther Gap Road PM 0.50 Storm Damage Repair Project
Infrastructure
Bidding
$4,895,255 est. value
CA

Operation and Maintenance Services of Sewer and Water Systems in County Service Area (Csa) R-1967-1 Castlewood
Alteration
Post-Bid
CA

PW Various Locations Pavement Renovation No 45 and Sewer Replacement
Infrastructure, Alteration
Results
$6,300,000 est. value
San Francisco, CA 94103

Last Updated 06/29/2022 07:01 AM
Project Title

Upcoming RFP: Canal Maintenance Program CEQA and Permitting Support

Physical Address View project details and contacts
City, State (County) San Jose, CA   (Santa Clara County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Bidding Expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is a service / maintenance or supply contract in San Jose, California. Contact the soliciting agency for additional information. The selected experienced and qualified consultant firm(s) will be tasked to provide Canal Maintenance Program CEQA & Permitting Support. Canal Maintenance Program Overview: Implementation of the Canal Maintenance Program will improve Valley Water's ability to conduct preventative, routine, and corrective maintenance along operable and inoperable canals and streamline the pertinent environmental approvals. Implementation of the Canal Maintenance Program will not affect future canal operations or uses. Canal Maintenance Activities: The Canal Maintenance Program covers the following maintenance activities: - Vegetation Management - Vegetation management is conducted to maintain access, maintain conveyance capacity and channel velocity, prevent blockages, prevent damage to the canal lining and embankment, abate weeds and reduce the control of invasive plant species, and reduce fire hazards. - Sediment Removal and Management - Excess sediment and debris that accumulates in the canals are mechanically removed to maintain flow, prevent blockages, reduce flood hazards, and discourage the growth of in-channel vegetation. - Bank Stabilization - Bank stabilization addresses issues such as sloughs, landslides, and erosion that threatens the stability of the hillside above the canal, the canal embankment, and/or the canal access road. - Repairs to Canal Lining and Walls - Damaged or failed sections of canal lining are repaired using grout, concrete patches, or shotcrete. - Culvert Repairs, Replacement, and Installation - Culverts and other drainage controls are used to collect runoff and convey it over, under, or into inoperable canals. Culverts also exist at road crossings. - Access Road Maintenance - In addition to keeping the access roads clear of vegetation, road access maintenance also includes filling in potholes and regrading to eliminate ruts and gullies and maintain proper drainage. Periodic re-graveling may also be necessary to maintain a strong road base and allow for year-round access. - Management of Animal Conflicts - Animal burrows can cause structural damage to the canal or destabilize the embankment. Animal conflicts are managed primarily by trapping. - Minor Maintenance - Minor maintenance includes repairing and installing fences, gates, and signage.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents