Similar Projects
Last Updated | 08/13/2023 05:31 AM |
Project Title | Kinzer Avenue Pumping Station Upgrade For Earl Township Sewer Authority |
Physical Address | View project details and contacts |
City, State (County) | New Holland, PA 17557 (Lancaster County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $218,900 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work will include, but will not necessarily be limited to, providing all labor, materials, equipment, and appurtenances for the following, as further described in the Contract Documents: Contract No. 1- General Construction: The project includes: demolition, replacement of control building roof, bypass pumping, installation of new generator base pad, generator exhaust piping, fans and louvers, unit heater, replacement of submersible pumps and controls, modification of the wet well, construction of a meter vault, associated piping and field instruments, and site work including paving. Other work as indicated in the Contract Documents. Contract No. 2- Electrical Construction: The project includes: demolition, replacement of power facilities at the site, including back-up generator, transfer switch, drives, transformer, power panels, power and control wiring for the project, and coordination of three phase service with utility. Other work as indicated in the Contract Documents This contract is subject to the Pennsylvania Prevailing Wage Act conditions. This contract is subject to the Federal Occupational Safety & Health Act of 1970 (OSHA) conditions. This contract is subject to Pennsylvania Human Relations Act 222 conditions. This contract is subject to the non-discrimination in Employment/Contract Compliance Regulations Conditions. Earl Township Sewer Authority reserves the right to accept or reject any or all bids or portions thereof. Question Deadline 07/18/2023 at 2:00 PM ET All questions and inquiries must be submitted in writing via PennBids Questions tab. Questions submitted in any other way (phone calls, fax, email, etc) shall not be addressed. Contract No. 1- General Construction: The project includes: demolition, replacement of control building roof, bypass pumping, installation of new generator base pad, generator exhaust piping, fans and louvers, unit heater, replacement of submersible pumps and controls, modification of the wet well, construction of a meter vault, associated piping and field instruments, and site work including paving. Other work as indicated in the Contract Documents. Contract No. 2- Electrical Construction: The project includes: demolition, replacement of power facilities at the site, including back-up generator, transfer switch, drives, transformer, power panels, power and control wiring for the project, and coordination of three phase service with utility. Other work as indicated in the Contract Documents |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |