Similar Projects
Pequea Boulevard Resurface
Infrastructure
Conception
$2,449,000 CJ est. value
Pequea, PA 17565

Pequea Boulevard Resurface
Infrastructure
Conception
$2,449,000 CJ est. value
Pequea, PA 17565

Greenville Road Bridge-B
Demolition, New Construction, Infrastructure
Design
$2,386,495 CJ est. value
Reinholds, PA 17569

Greenville Road Bridge-B
Demolition, New Construction, Infrastructure
Design
$2,386,495 CJ est. value
Reinholds, PA 17569

Asphalt Paving
Infrastructure
Post-Bid
Millersville, PA

W. Frederick & S. Duke Street Infrastructure Improvements
Infrastructure
Post-Bid
$1,061,995 CJ est. value
Millersville, PA 17551

Hackman Road Repair and Overlay Project
Results
$63,000 est. value
Stevens, PA

Regional WWTP and Collection System - General Construction
New Construction
Results
East Earl, PA

Miller Road Sewage Pumping Station Expansion - Contract No. 4 - Force Main
Addition, Demolition, Renovation, Infrastructure
Construction
$2,071,083 CJ est. value
Elizabethtown, PA 17022

Miller Road Sewage Pumping Station Expansion - Contract No. 4 - Force Main
Addition, Demolition, Renovation, Infrastructure
Construction
$2,071,083 CJ est. value
Elizabethtown, PA 17022

Garden Spot Village / Ranck Road
New Construction, Infrastructure - 68,000 SF
Pending Verification
$8,500,000 CJ est. value
New Holland, PA 17557

Garden Spot Village / Ranck Road
New Construction, Infrastructure - 68,000 SF
Pending Verification
$8,500,000 CJ est. value
New Holland, PA 17557

North Churchtown Rd Bridge
Infrastructure, Renovation
Conception
$2,170,000 CJ est. value
East Earl, PA 17519

PA 72 over Chiques Creek
Demolition, New Construction, Infrastructure
Design
$870,000 CJ est. value
Rapho Township, PA 17545

Perform Road Widening Excavation
Infrastructure
Post-Bid
Marietta, PA

Last Updated 08/13/2023 05:31 AM
Project Title

Kinzer Avenue Pumping Station Upgrade For Earl Township Sewer Authority

Physical Address View project details and contacts
City, State (County) New Holland, PA 17557   (Lancaster County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $218,900 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will include, but will not necessarily be limited to, providing all labor, materials, equipment, and appurtenances for the following, as further described in the Contract Documents: Contract No. 1- General Construction: The project includes: demolition, replacement of control building roof, bypass pumping, installation of new generator base pad, generator exhaust piping, fans and louvers, unit heater, replacement of submersible pumps and controls, modification of the wet well, construction of a meter vault, associated piping and field instruments, and site work including paving. Other work as indicated in the Contract Documents. Contract No. 2- Electrical Construction: The project includes: demolition, replacement of power facilities at the site, including back-up generator, transfer switch, drives, transformer, power panels, power and control wiring for the project, and coordination of three phase service with utility. Other work as indicated in the Contract Documents This contract is subject to the Pennsylvania Prevailing Wage Act conditions. This contract is subject to the Federal Occupational Safety & Health Act of 1970 (OSHA) conditions. This contract is subject to Pennsylvania Human Relations Act 222 conditions. This contract is subject to the non-discrimination in Employment/Contract Compliance Regulations Conditions. Earl Township Sewer Authority reserves the right to accept or reject any or all bids or portions thereof. Question Deadline 07/18/2023 at 2:00 PM ET All questions and inquiries must be submitted in writing via PennBids Questions tab. Questions submitted in any other way (phone calls, fax, email, etc) shall not be addressed. Contract No. 1- General Construction: The project includes: demolition, replacement of control building roof, bypass pumping, installation of new generator base pad, generator exhaust piping, fans and louvers, unit heater, replacement of submersible pumps and controls, modification of the wet well, construction of a meter vault, associated piping and field instruments, and site work including paving. Other work as indicated in the Contract Documents. Contract No. 2- Electrical Construction: The project includes: demolition, replacement of power facilities at the site, including back-up generator, transfer switch, drives, transformer, power panels, power and control wiring for the project, and coordination of three phase service with utility. Other work as indicated in the Contract Documents

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents