Similar Projects
Last Updated | 10/18/2022 09:42 AM |
Project Title | RFP D/B - Hot Mix Asphalt Resurfacing and Reconstruction on I-94 |
Physical Address | View project details and contacts |
City, State (County) | Marshall, MI 49068 (Calhoun County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction Commenced, Construction start expected October 2022 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $159,129,390 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Design Build Project: 10.03 miles of hot mix asphalt resurfacing and reconstruction on I-94; resurfacing of I-94 from west of Helmer Road to 6 Mile Road and from east of I-94BL (Michigan Avenue) to west of 17 Mile Road; replacement of nine structures and the rehabilitation of eight structures including profile changes at the I-94 at Capital Avenue interchange to improve underclearance; reconstruction of I-94 over and under select bridges; paving of various ramps; guardrail upgrades, pavement markings, drainage improvements; and reconstruction of the rest area parking lot in the city of Battle Creek, Emmet and Marshall townships, Calhoun County. This project includes a 5 year materials and workmanship pavement warranty, a 3 year materials and workmanship pavement warranty, a 5 year warranty for thin epoxy polymer bridge deck overlay, a 2 year warranty on concrete surface coating, and a 2 year warranty on bridge coating. Only shortlisted contractors are eligible to bid on this project. Control Sec Job No Federal No IM 13082 201957A 22A0557 IM 13081 204348A 22A0558 RBMP 13082 210073A 22A0562 M 13082 212581A N/A IM 13083 203387A 22A0561 IM 13082 210837A 22A0560 IM 13081 204349A 22A0559 Net classification required for this project is 106000 Cb or 106000 Fa In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. MDOT - 2208 201 - RFP D/B - Hot Mix Asphalt Resurfacing and Reconstruction on I-94 Job Numbers: 201957, 203387, 204348, 204349, 210073, 210837, 212581 Letting Date/Item Number: 220708 701 Completion Date: 11/15/2025 Final Acceptance for the Project on or before June 27, 2026 |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |