Similar Projects
Target
Renovation
Design
Saint Louis Park, MN 55426

Pre-formed Expansion Joint Filler
Term Contract
Post-Bid
Minneapolis, MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Pedestrian Crossing and Bikeway Safety Improvements - REBID
Renovation
Results
Bloomington, Eden Prairie, Minneapolis, MN

Quarter Lake West Apartments Phase I
New Construction
Construction
$224,000,000 est. value
Minneapolis, MN 55416

Midtown Lofts 2021 Exterior Repair
Renovation
Construction
$2,500,000 to $3,000,000 est. value
Minneapolis, MN 55405

Meadowbrook Elementary School Parking Lot Improvements
Post-Bid
Golden Valley, MN 55422

Grand Avenue South Reconstruction
Results
Minneapolis, MN 55400

2021 Parking Structure Rehabilitation
Construction
$2,408,193 est. value
Minneapolis, Saint Paul, MN 55111

Ramp B Waterproofing and Structural Repairs
Post-Bid
Minneapolis, MN

2021 Infrastructure Improvements
Results
$1,500,000 to $2,000,000 est. value
MN

Appaloosa Woods Area Street Reconstruction
Post-Bid
Maple Grove, MN

2021 Hidden Oaks Lane/Woods Trail/Coneflower Circle Improvement Project
Results
$1,270,000 est. value
Champlin, MN 55316

Huntington Farms East and West Area Street Reconstruction
Post-Bid
Maple Grove, MN

Last Updated 07/21/2022 03:03 PM
Project Title

2022 Rec Center Parking Lot

Physical Address View project details and contacts
City, State (County) St Louis Park, MN 55416   (Hennepin County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Finishes/Exterior, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $209,361 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 21, 2022, project was awarded, start date is End of August and will be completed by end of September this year** The work includes the construction of the following approximate quantities: 13,697 SY of Mill Bituminous Surface (2") 1,654 TON Type 9.5 Wearing Course Mix (2, B) 5,854 LF of 4" Solid Line Multi Comp 36 SF of Pavt Message Thermo Gr In All work under the Contract must be completed by the dates specified in the project specifications. A bid bond in the amount of not less than 5% percent of the total amount bid, drawn in favor of the City of St. Louis Park shall accompany each bid. The City Council reserves the right to reject any and all bids, to waive irregularities and informalities therein and the right to award the contract in the best interests of the City.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents