Similar Projects
Floral-Eaton Roundabout - 50472 - City of Chico
Alteration
Conception
$3,317,389 est. value
Chico, CA 95973

Strawberry Point Elementary School - 2022 Measure G School Bond Priority 4 Projects - Mill Valley School District
Renovation
Conception
$45,669,738 est. value
Mill Valley, CA 94941

AutoZone #5666 / Bakersfield
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Bakersfield, CA 93301

Lakeshore Stewardship IRSC
Infrastructure
Design
$150,000 CJ est. value
Prather, CA 93651

Const Aux Lane, Compaction Grouting, RHMA, Landscape, and Electrical
Infrastructure
Bidding
$42,000,000 CJ est. value
San Diego, CA 92124

Sterns Park Improvement Project
Infrastructure - 16,500 SF
Bidding
$780,000 CJ est. value
Los Alamitos, CA 90720

D-B - Repair DIPC, Dental Lab, Dental Treatment Facility Bldg
Demolition, Build-out, Renovation, Infrastructure
Sub-Bidding
$7,000,000 CJ est. value
Camp Pendleton North, CA 92058

Orinda Intermediate School - Student Services Center
New Construction, Infrastructure - 6,440 SF
Sub-Bidding
$1,750,000 CJ est. value
Orinda, CA 94563

Preconstruction and Lease-Leaseback Construction Services
Renovation
Post-Bid
$2,640,000 est. value
Gustine, CA 95322

Mammoth High School Addition and Modernization Project
Addition, Demolition, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Mammoth Lakes, CA 93546

Site Demolition/Construction: Renovation Work to Interiors of Head Start Buildings A, B & C
Renovation, Alteration
Results
San Gabriel, CA 91778

Construct Curb Ramps, Sidewalks and Modify Signal Systems
Infrastructure
Results
$2,510,888 CJ est. value
Sacramento, CA 95829

Napa Cove Affordable Apartments
New Construction, Infrastructure
Construction
$36,445,998 CJ est. value
American Canyon, CA 94503

Walden Garden Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Walnut Creek, CA 94597

Inland Valley Medical Center Patient Tower
New Construction, Infrastructure - 290,000 SF
Pending Verification
$170,000,000 CJ est. value
Wildomar, CA 92595

Last Updated 10/12/2022 11:33 PM
Project Title

Weed E.S. New Admin / Classroom Building Increment 2 Bid Package WES 2022.2.31.b Earthwork / Concrete

Physical Address View project details and contacts
City, State (County) Weed, CA 96094   (Siskiyou County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall perform within the time stipulated the contract as herein defined, and shall provide all labor, equipment, materials, tools, utility services, and transportation to complete in a workmanlike manner all the work required in connection with the following titled project: WEED E.S. NEW ADMIN / CLASSROOM BUILDING INCREMENT 2, Bid Package WES2022.2.31.B Earthwork / Concrete in strict compliance with the Contract Documents as specified in Article 4 below, which shall be free from any and all liens and claims from mechanics, material suppliers, subcontractors, artisans, machinists, teamsters, freight carriers, and laborers required for the Project. Any clarifications resulting from questions will be distributed to all firms participating in this opportunity who have received a copy of the Bid documents. Questions received after 2:00 p.m. on October 14, 2022, will NOT be addressed. Successful bidder shall file a payment and performance bond issued by an admitted Surety authorized to conduct business in California, in the form set forth in the Contract Documents. A payment bond may be required for contracts involving smaller expenditures at the option of the District. All forms must be completed, signed, and returned with the bid. The successful bidder shall commence work on or before July 11, 2022. All work shall be completed within 30 working days and not later than August 21, 2022

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents