Similar Projects
USCG Repair Steam Distribution System
Term Contract, Infrastructure
Bidding
$2,000,000 to $3,000,000 est. value
New London, CT 06320

Fair Haven Branch Library HVAC Control System
Alteration
Bidding
New Haven, CT 06510

Design/Build HVAC Replacement System for John B. Stanton Elementary School
Post-Bid
Norwich, CT 06360

Installation of Split System HVAC Systems at Suffield Middle School
Post-Bid
Suffield, CT 06078

Air Handling Units (AHU) - 10 Humidifier Replacement
Results
Less than $96,206 est. value
Farmington, CT

Z--HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) Maintenance and Repair Services and Direct Digital Controls (DDC)
Results
Groton, CT

HVAC Services
Alteration
Bidding
Bloomfield, CT

HVAC Services
Post-Bid
New Haven, CT

Service to the Cooling Tower
Results
Waterbury, CT 06702

Family Studies AC Replacement
Alteration
Bidding
Storrs, CT

Replacement of HVAC Air Handlers at the East Lyme Town Hall
Post-Bid
Niantic, CT 06357

LOB HVAC Air Compressor System
Term Contract
Results
Hartford, CT

Heating Upgrades Putnam Refectory
Alteration
Bidding
Storrs, CT

Inspection/Preventative Maintenance of Carrier Water Cooled Chillers
Term Contract
Post-Bid
Hartford, CT 06105

CHS and CNHMS Improvements - HVAC
Results
Coventry, CT 06238

Last Updated 11/22/2021 05:21 PM
Project Title

Plainfield High School Repair of 12 Air Handling and Cooling Rooftop Unit

Physical Address View project details and contacts
City, State (County) Plainfield, CT 06332   (Windham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 08/31/21
Owner View project details and contacts
Architect View project details and contacts
Description

Plainfield Public Schools is seeking a contractor to repair and install new components into the #12 Air Handling and Cooling Rooftop Unit of Plainfield High School. The scope of the repair work may include, but not be limited to: Remove and replace three (3) compressor units. Remove and replace three (3) crank case heaters. Remove and replace three (3) contactors. Remove and replace two (2) time delay relays Remove and replace one (1) condenser fan motor. Remove and replace one (1) condenser fan blade. Remove and replace the filer cores in the refrigerant circuits. Pressure test the system. Evacuate the system and charge with new R-22 refrigerant. Start the system and test for proper operation

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents