Similar Projects
Traffic Signal Improvements
Infrastructure
Post-Bid
Weslaco, TX

Traffic Signal Installations at Dewitt Road and Ingram Road, Dewitt Road at Ranch Road and Woodbridge Parkway at Cody Lane
Infrastructure
Post-Bid
$1,000,000 est. value
Sachse, TX

Traffic Signal Construction at Fishtrap Road/Gee Road and Coit Road/Richland Boulevard
Results
$398,000 est. value
Prosper, TX 75078

Traffic Signal Improvements
Results
Less than $2,115,690 est. value
TX

Traffic Control Services
Infrastructure
Post-Bid

Traffic Signal Maintenance
Results
Less than $373,336 est. value
TX

Traffic Signal Fallbrook Drive at Greens Crossing Boulevard
Results
TX

HPW - Traffic Signal Work Order Project FY21
Results
$5,000,000 est. value
Houston, TX

HPW - Citywide Traffic Signal Improvements, Intersection Redesign and Safety Improvements
Results
$7,500,000 est. value
Houston, TX

US0059 - Traffic Control
Infrastructure
Results
$7,746,000 est. value
TX

VA - Traffic Signal Cabinet and Equipment Installation
Infrastructure
Results
$2,053,200 est. value
TX

FM 20 - Install Traffic Signal
Infrastructure
Results
$132,575 est. value
TX

Last Updated 12/09/2021 11:11 AM
Project Title

Traffic Signal Improvements at Bailey Boswell Road at Knowles Drive

Physical Address View project details and contacts
City, State (County) Saginaw, TX   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of a new traffic signal at the intersection of Bailey Boswell Rd. and Knowles Dr. The project includes but not limited to installation of traffic signal poles and arms, traffic and signal heads, vehicle and pedestrian detections, emergency vehicle preemption, traffic signal foundations, pavement markings and signs. The project also includes installation of new ADA compliant sidewalk, curb ramps and push buttons.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents