Similar Projects
South Commercial Avenue Corridor Plan - Phase II Commercial Avenue from 14th to 34th - City of Anacortes
Infrastructure
Conception
$60,000,000 CJ est. value
Anacortes, WA 98221

South Commercial Avenue Corridor Plan - Phase II Commercial Avenue from 14th to 34th - City of Anacortes
Infrastructure
Conception
$60,000,000 CJ est. value
Anacortes, WA 98221

SR 9/Marsh Road to 2nd Street Vic - Widening
Infrastructure
Design
$130,600,000 est. value
Mount Vernon, WA 98273

I-5 / Maddox Creek - Fish Passage
Infrastructure
Design
$15,457,000 CJ est. value
Mount Vernon, WA 98273

Hoag / Laventure Intersection Improvements Project
Infrastructure
Bidding
$1,300,000 CJ est. value
Mount Vernon, WA 98273

Hoag / Laventure Intersection Improvements Project
Infrastructure
Bidding
$1,300,000 CJ est. value
Mount Vernon, WA 98273

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

32nd Street and M Avenue Intersection Improvements
Infrastructure
Post-Bid
Anacortes, WA 98221

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Fidalgo Bay Road Reconstruction - City of Anacortes
Infrastructure
Conception
$9,500,000 CJ est. value
Anacortes, WA 98221

The Crossings Cottages Development
New Construction, Infrastructure
Design
$800,000 CJ est. value
Anacortes, WA 98221

2023 Curb Ramps
Infrastructure
Bidding
$435,000 CJ est. value
Mount Vernon, WA 98273

South Fork Skagit River Floodplain Restoration
Infrastructure
Post-Bid
$2,000,000 to $2,250,000 est. value
Mount Vernon, WA 98274

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

Last Updated 02/04/2023 04:48 AM
Project Title

Lake Cavanaugh Access Redevelopment Phase 2

Physical Address View project details and contacts
City, State (County) Mount Vernon, WA 98273   (Skagit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $83,308 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Lake Cavanaugh Access Redevelopment Phase 2 Provide all labor, materials, equipment, and permits to construct access improvements including demolition, clearing, grading, asphalt paving and the installation of three boarding float assemblies with piling at the Department's Lake Cavanaugh Access Area, located at 34951 S. Shore Rd, Mount Vernon, Washington 98274 in Skagit County For information or technical questions regarding this project, email CAMP.Bids@dfw.wa.gov with the project title and project number in subject line.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents