Similar Projects
Winery and Patio
New Construction, Infrastructure - 4,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rosemount, MN 55068

Bituminous Replacement and ADA Work
Alteration
Conception
$3,800,000 est. value
Akeley, MN 56433

Reconstruction and Resurfacing With Pedestrian ADA and Utilities
Infrastructure, Alteration
Design
$5,400,000 est. value
Barnesville, MN 56514

2022 Street and Utility Improvement Project
Infrastructure
Bidding
$2,000,000 est. value
Crosby, MN

2022 Sidewalk Project Reconstruction
Infrastructure
Bidding
$300,000 est. value
Winona, MN

New Heights Elementary School, South Point Elementary School, Central Middle School - 2021 Improvements
Post-Bid
East Grand Forks, MN 56721

West Bridge Street Reconstruction
Post-Bid
$3,400,000 est. value
Owatonna, MN

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

Sakatah Singing Hills State Trail Lime Valley Slope Failure
Results
Less than $356,970 est. value
Mankato, MN

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

Cornerstone Village Apartments
New Construction
Construction
$1,680,000 est. value
Oakdale, MN 55128

PrairiE Loft Apartments Parking Lot Paving
Infrastructure
Bidding
$415,000 est. value
Luverne, MN

Meadowbrook Elementary School Parking Lot Improvements
Post-Bid
Golden Valley, MN 55422

2021 Street and Utility Improvement
Results
$3,700,000 est. value
Montgomery, MN

Parking Improvements at Colleen Loney Manor (CLM)
Infrastructure
Bidding
$300,000 est. value
Saint Paul, MN 55118

Last Updated 06/29/2022 06:58 AM
Project Title

SRTS - Pedestrian Ramp Replacement and Sidewalk Construction

Physical Address View project details and contacts
City, State (County) Fosston, MN   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes installing new sidewalk and pedestrian ramps, replacing existing pedestrian ramps, and updating entrance to Civic Center to comply with ADA requirements. Categories of work include grading, aggregate base, bituminous and concrete.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents