Similar Projects
Last Updated | 05/04/2023 11:36 AM |
Project Title | RFP Engineering - Perpetuation - Resurfacing Neillsville - Marshfield - USH 10 from STH 73 to East County Line |
Physical Address | View project details and contacts |
City, State (County) | Neillsville, WI 54456 (Clark County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected August 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $12,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of May 4, 2023, an engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to August 2023. *The closed solicitation has been included below for reference: The pavement needs treatment to extend its service life. Perpetuation project to mill and resurface 16.32 miles of USH 10 from STH 73 to East County Line, City of Neillsville, Towns of Pine Valley, Grant, Lynn, and Fremont, in Clark County. Work includes paving wider shoulders, intersection concrete pavement repairs, traffic signal replacement and upgrade, culvert work, cleaning ditches, curb and gutter, inlets, storm sewer, replace all guardrail, curb ramp upgrades, and pavement markings. Anticipated Construction Cost: $11,000,000-$11,999,999 Advertised Fixed Fee %: 7.25 DBE goal on project: No The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Perpetuation - Resurfacing Neillsville - Marshfield *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |