Similar Projects
Clear Creek Bank Stabilization (North of Oakland Street) - City of Ames
Infrastructure
Conception
$630,000 CJ est. value
Ames, IA 50014

Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

South Area Trunk Sewer - Western Extension Segments 3 and 8
Infrastructure
Design
$17,781,000 CJ est. value
Des Moines, IA 50315

Municipal Water Well Improvements Rebid
Infrastructure
Design
$1,131,320 CJ est. value
Dayton, IA 50530

High School Addition & Renovation
Addition, Demolition, Renovation, Infrastructure - 192,000 SF
Bidding
$3,000,000 CJ est. value
Orange City, IA 51041

West 3rd Street and West Street Intersection Improvements
Infrastructure
Bidding
$940,270 CJ est. value
Sioux City, IA 51103

New 5-6 Intermediate - Bid Package 3 Landscaping and Seeding
Infrastructure
Sub-Bidding
Cedar Rapids, IA 52404

Bnsf Slope Stabilization
New Construction, Term Contract
Post-Bid
Avery, IA

Test Drilling at North River Valley
Infrastructure
Post-Bid
$50,000 est. value
Ames, IA

Auxiliary Site Clearing
Demolition, Alteration
Results
Davenport, IA 52802

Earlham Lagoon Upgrades
Renovation
Results
$3,979,000 est. value
Earlham, IA 50072

Taxium 5th Mixed Use Development
New Construction, Infrastructure
Pending Verification
$6,500,000 CJ est. value
West Des Moines, IA 50265

Town Square Streetscape - City of Indianola
Infrastructure
Pending Verification
$4,700,000 CJ est. value
Indianola, IA 50125

Hickman Road/U.S. Highway 6 at 128th Street - ST18-01 - City of Urbandale
Infrastructure
Conception
$5,537,400 CJ est. value
Urbandale, IA 50322

Gibson Memorial Library
Addition, Renovation, Infrastructure - 8,000 SF
Design
$4,700,000 CJ est. value
Creston, IA 50801

Last Updated 09/06/2022 10:02 AM
Project Title

Waste Water Treatmet Facility Lagoon Sludge Removal

Physical Address View project details and contacts
City, State (County) Winfield, IA 52659   (Henry County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All Work, materials, and equipment are to be in accordance with the Contract Documents on file in the office of the City Clerk, and at the office of HR Green, Inc. ("Engineer"), 8710 Earhart Lane SW, Cedar Rapids, IA 52404, by this reference made a part hereof as though fully set out and incorporated herein. The Work for the said improvement, as required by the Contract Documents, is generally described as follows: The removal and land application of sludge from existing wastewater treatment lagoons and all necessary sampling, documentation and coordination as required by the State of Iowa. Contractor shall identify application sites and secure agreements for the land application of sludge. Land application shall be completed prior to the Final Completion date specified here within. The City of Winfield, Iowa, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Work under the proposed Contract Documents shall be commenced upon written Notice to Proceed to be issued on or before October 12, 2022 and shall be completed and ready for operation on or before December 1, 2022, subject to any extension of time, which may be granted by the Owner. A pre-bid conference will not be held. Each Bid shall be made on the Bid Form prepared for this purpose, which may be obtained from the Engineer. Any alteration in the official Bid Form will entitle the Owner, at its option, to reject the Bid from consideration. Each Bid shall be accompanied by a Bid Bond or a certified cashier's check, drawn on a solvent state or national bank, or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, and filed in a sealed envelope separate from the one containing the Bid. The Bid Bond shall be substantially in the form set forth in the Contract Documents. The Contractor's certified check or Bid Bond shall be in an amount equal to 5 percent of the amount of the Bid, made payable to the Owner. The check may be cashed for the full amount by the Owner or the Bid Bond forfeited in the full amount to the Owner as liquidated damages in the event the successful Bidder fails to enter into contract and file acceptable bonds satisfactory to the Owner assuring the faithful fulfillment of the contract and maintenance of said improvements as required by law within Ten (10) days after the acceptance of the Bid. The successful Bidder will be required to furnish a Performance and Warranty Bond and a Payment Bond, each in an amount equal to 100 percent of the contract price. Said bonds to be issued by a responsible Surety approved by the Owner and shall guarantee that the Principal shall promptly make payment to all persons, firms, Subcontractors, and corporations furnishing materials for or performing labor in the performance of the Work stated and the faithful performance of the contract and the terms and conditions therein contained and the guarantee and maintenance of said facilities in good repair and working conditions for not less than N/A year(s) from the Notice of Acceptability of such improvements by the Owner. Payment of the cost of said project will be made from cash on hand and/or received, payable from any fund or funds of Owner which may be legally used for such purpose, including, but not limited to, any of the following sources, or any combination thereof, at the sole discretion of Owner: (1) past and/or future earnings of Owner's utility; (2) proceeds of the sale and issuance of General Obligation Bonds and/or revenue bonds (or project notes anticipating the sale of such bonds); (3) federal, State or local grants or loans; and (4) proceeds from the sale of warrants, as authorized by Section 384.57 of the Code of Iowa. Payments will be made to the Contractor in accordance with the Contract Documents. Your special attention is invited to the attached MBE/WBE Subcontractor Solicitation Information Form and Certification Regarding Debarment, Suspension, and Other Responsibility Matters Form. Both forms must be completed and submitted with your bid proposal. Failure to submit both forms will cause the bid to be rejected. Bidders shall demonstrate compliance with good faith efforts in order to be deemed responsible. The information shall be included for each MBE/WBE Subcontractor contacted by the bidder, not just those used to meet the fair share objective. By completing the MBE/WBE Subcontractor Solicitation Information Form, you are advising the City how the contract goal will be met. The Owner reserves the right to reject any or all Bids, to readvertise for Bids or to defer action on the Bids received for a period not to exceed Number of Days Owner has to accept bids days from and after the date and time specified in this Notice to Bidders for receiving said Bids, and to waive irregularities and informalities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents