Similar Projects
2Life Opus
New Construction, Infrastructure
Conception
$53,000,000 est. value
Newton, MA 02459

Z--Lowe Rehabilitate Central Street Walkway
Term Contract
Design
$500,000 to $1,000,000 est. value
Lowell, MA 01852

Middlesex Community College Bedford Quad Patio Project
Infrastructure
Bidding
$205,997 est. value
Bedford, MA 01730

Resurfacing of Various Streets and Appurtenant Work
Infrastructure
Bidding
$835,000 est. value
Marlborough, MA

Complete Streets Sidewalk Project, Great Road at Old Bolton Road and Harvard Road
Post-Bid
Less than $216,000 est. value
Stow, MA

Construction of Walkways With Lights
Post-Bid
Hudson, MA

Scheduled and Emergency Sidewalk and ADA Improvements and Related Work at Various Locations (Including Marthas Vineyard)
Results
Less than $670,000 est. value

Sidewalks, Driveway Aprons, Parking Lots
Results
$117,000 est. value
Acton, MA

Complete Streets Intersection Improvements
Infrastructure
Bidding
$400,000 est. value
Sudbury, MA 01776

Concrete Sidewalk Reconstruction and ADA Ramps
Post-Bid
$200,000 est. value
Winchester, MA

Reconstruction Pearl Street Parking Lot
Results
Less than $351,000 est. value
Newton, MA 02458

Lincoln Street Sidewalk Project
Infrastructure
Bidding
$570,000 est. value
Lexington, MA 02421

Downtown Hudson Riverwalk Construction
Post-Bid
$250,000 est. value
Hudson, MA

Asphalt Sidewalk Replacement
Results
$46,574 est. value
Winchester, MA 01890

Coburn Road Sidewalk Extension
Infrastructure
Bidding
$120,000 est. value
Tyngsborough, MA 01879

Last Updated 06/29/2022 02:19 PM
Project Title

Old Framingham Road Walkway Extension Project

Physical Address View project details and contacts
City, State (County) Sudbury, MA   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $420,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction and realignment of roadway and intersection; road subbase; guardrails; grading; erosion and sedimentation control; construction of new sidewalk; removal of drainage structures and drain pipe; construction of new drainage structures and drain pipe; replacement of closed-channel culvert segment with pipe culvert; construction of new headwalls; repointing of existing stone masonry headwall; development and execution of a water control management plan as necessary during construction; protection and support of existing utilities; other surficial improvements

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents