Similar Projects
Street Resurfacing Project
Post-Bid
Abilene, TX 79600

Turner Lane Paving and Drainage Improvements
Post-Bid
Tuscola, TX 79562

Southern Region Disaster Recovery Support BPA
Results

Pioneer Drive (2019) Project
Term Contract
Results
$602,925 est. value
Abilene, TX 79605

Street Resurfacing Project Work Zone S10 and S17
Post-Bid
Abilene, TX

Ridgemont Drive Reconstruction Project
Results
$993,833 est. value
Abilene, TX

Street Resurfacing Project Work Zone N3, N5, N8, and N14
Post-Bid
Abilene, TX

Abilene CBD Concrete Street Repair
Results
$6,500,000 est. value
Abilene, TX 79601

Pine Street Area Rehabilitation Project
Post-Bid
Abilene, TX 79601

PED
Results
Less than $5,055,707 est. value
TX

Airport Blvd Resurfacing
Post-Bid
Abilene, TX 79604

Seal Coat
Results
Less than $7,601,891 est. value
TX

Southwest Drive Resurfacing
Post-Bid
Abilene, TX 79600

Street Resurfacing Project on Work Zone S15
Results
$1,559,189 est. value
Abilene, TX 79600

Griffith Road Reconstruction
Post-Bid
Abilene, TX

Last Updated 08/27/2020 11:11 AM
Project Title

Butternut Street Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Abilene, TX 79604   (Taylor County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,809,646
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This construction contract involves the reconstruction of Butternut Street starting on the West TxDOT ROW on S. Treadaway and Butternut to S. I5' Street as outlined in the Construction Plans. This contract will also include ive full concrete intersections and six partial intersections as well as concrete valleys gutters at varies location and ADA curb ramps as outlined in the Construction Plans. The old concrete pavement from S. 17th Street to S. 21st Street will be removed and replaced to the Proposed Section as shown in the Construction Plans. The rest of Butternut Street, not including the concrete pavement areas, will be a mill and overlay and any full depth repairs as needed to the Proposed HMAC Street Section as shown in the Construction Plans. All of the HMAC roadway will also include an under seal. Part of Butternut Street is on the Master Bicycle Plan so Bike Route Signs will be placed rom S. 20,h Street to S. I51 Street. TxDOT Standard Thermoplastic Pavement Markings will be used the full length of the Project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents