Similar Projects
Parking Lot Seal Coat, Crack-fill, and Restriping
Infrastructure
Bidding
Naperville, IL

FY 22 Sidewalk and Concrete Replacement Program
Infrastructure
Bidding
Wood Dale, IL

Mack Road Multi-Use Path and Bridge Reconstruction
Post-Bid
$250,000 to $500,000 est. value
Warrenville, IL 60555

Forest North Parking Lot and Burlington Avenue Improvements
Post-Bid
Downers Grove, IL

Construction of A Multi-use Path, Pedestrian Bridge and Boardwalk Adjacent
Results
Oak Brook, IL 60523

Mack Road Trail Extension at St. James Farm Forest Preserve
Results
Less than $357,500 est. value
Wheaton, IL 60189

2021 Sidewalk and Curb Maintenance Program
Post-Bid
Naperville, IL

2020 PCC Sidewalk Trip Hazard Removal
Results
Roselle, IL

2021 Sidewalk Replacement Program
Post-Bid
IL

2020 Sidewalk and Curb Replacement Program
Results
Lisle, IL 60532

Street and Driveway Restoration
Post-Bid
Downers Grove, IL

Resurfacing, Sidewalks, Landscaping and Contruction of A Train Platform Shelter
Results
Clarendon Hills, IL 60514

2021 Sidewalk Replacement Program
Post-Bid
Downers Grove, IL

2020 Sidewalk and Curb Maintenance Program
Results
$130,000 est. value
West Chicago, IL 60185

2021 Hardscape Improvements
Post-Bid
Aurora, IL 60504

Last Updated 05/26/2021 06:32 PM
Project Title

Sidewalk

Physical Address View project details and contacts
City, State (County) IL   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $261,687
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Of New Sidewalk, Including Pcc Sidewalk 5" - 5,743 Sq Ft, Pcc Sidewalk 7" - 271 Sq Ft, Sidewalk Removal - 1,915 Sq Ft, Earth Excavation - 351 Cu Yd, Sodding Salt Tol - 633 Sq Yd, Sodding - 358 Sq Yd, Subbase Gran Matl Ty b - 667 Sq Yd, Comb Conc c&g b6.12 - 161 Ft, Comb Conc c&g b6.18 - 132 Ft, Agg Base Course Ty b 8" - 49 Sq Yd, Hma Binder Cse Il-19.0 n50 - 5 Ton, Hma Surf Cse Il-9.5 Mix d n50 - 5 Ton, Driveway Pavement Removal - 47 Sq Yd, Storm Sewer Cl a Ty 1 12" - 57 Ft, Storm Sewer Cl a Ty 1 18" - 46 Ft, Inlets Ty a - 2 Each, Inlets Ty b - 1 Each, Traffic Signal Post, Glavanized Steel 10 Ft - 2 Each, Traffic Signal Post Galvanized Steel 16 Ft - 1 Each, Ped Push Button - 1 Each, Detector Loop Ty i - 180 Ft, Detector Loop Replacement - 120 Ft, Thpl Pvmnt Mark 12" - 778 Ft, Traffic Control And Protection - 1 Lump Sum

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents