Similar Projects
Water Utility Improvements Division "C" New Water Distribution System
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Eaton, IN 47338

Morningstar Road Project
Infrastructure
Bidding
$899,752 CJ est. value
Auburn, IN 46706

Hardy Lake Dam Valves Replacement
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Scottsburg, IN 47170

Residential Energy Conservation Services
Renovation, Infrastructure
Post-Bid

Residential Energy Conservation Services
Renovation, Infrastructure
Post-Bid

Plumbing Fixture Upgrades
Alteration
Results
New Haven, IN

Huntertown Elementary School Plumbing
Alteration
Results
$215,000 est. value
Huntertown, IN 46748

Park Road and 200 West Water Main
Infrastructure
Construction
$371,319 CJ est. value
Greensburg, IN 47240

Foraker, Southwest and Tecumseh Wastewater Project
Infrastructure
Bidding
$300,000 CJ est. value
Goshen, IN 46526

Batchelor Middle School Mechanical, Plumbing and Control Upgrades
Alteration
Post-Bid
Bloomington, IN 47403

Plumbing Repair
Alteration
Results
Nashville, IN

Plumbing Services at the James Hunter Building
Alteration
Post-Bid
East Chicago, IN 46312

Mount Vernon Transportation Center MEP
Alteration
Results
IN

Plumbing, Mechanical, Electrical Work for the New Mt. Vernon Elementary School
Alteration
Post-Bid
Fortville, IN

Rehabilitation and Repainting of the Dubois Co. 4-H/Park Existing 200,000 Gallon Elevated Water Storage Tank
Infrastructure
Results
$135,200 CJ est. value
Saint Anthony, IN 47575

Last Updated 01/11/2023 06:31 PM
Project Title

Seymour East Sanitary Sewer Improvements Project

Physical Address View project details and contacts
City, State (County) Seymour, IN 47274   (Jackson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $669,350 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Seymour East Sanitary Sewer Improvements Project This Project Consists of a Lump Sum Bid for the Construction of a Forecemain, Gravity Sewer, Lift Station Rehab, and Other Miscellaneous and Related Items. After review and award of a contract, the Owner will provide a "Notice to Proceed" to the Contractor. Contractor will have 240 days to achieve substantial completion and an additional 30 days to complete all work for this project, for a total of 270 days after issuance of "Notice to Proceed" to project closeout. Substantial completion date is therefore anticipated to be SEPTEMBER 23, 2023, and final completion date is therefore anticipated to be OCTOBER 23, 2023, based on a Notice to Proceed and Contract approval by JANUARY 26, 2023. Contractor will be assessed $300.00 a day liquidated damages for any work remaining over and above either of the specified contract completion dates. Progress payments may be made on a standard monthly claim basis, with 10% retainage, and said retainage may be held up to three months after the successful completion of this contract. There is no retainage reduction for this project. Any questions LEGALS should be emailed in writing to c . Only those plan holders registered through the Engineer will be allowed to submit a bid for the project. Only those who obtain Bid Documents through FPBH, Inc. will be automatically notified of addenda. Each bid must be accompanied by a Bid Bond or Certified Check in a sum equal to 10% of the amount of the bid unless otherwise specified, and a completed Non-Collusion Affidavit. Bid prices must be firm for a period of ninety (90) days from the bid opening date. Should a successful bidder withdraw his bid, or fail to execute a satisfactory contract within ten (10) days after notice of acceptance of his bid, the owner may declare the Bid Security forfeited as liquidated damages, not as penalty. The successful bidder shall furnish a Performance and Labor and Materials Payment Bond in an amount equal to one hundred percent (100%) of the contract sum with an approved surety company. Said bond shall remain in full force and effect for a period of one (1) year after date of final acceptance of the work. CITY OF SEYMOUR, reserves the right to accept or reject any bid and to waive any or all formalities.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents