Similar Projects
Saint Gobain Plant Expansion
Addition
Conception
Ravenna, OH 44266

Superior Dairy
Addition
Conception
$25,000,000 est. value
Canton, OH 44706

Cracker Ethane Plant
New Construction
Design
$5,000,000,000 est. value
Shadyside, OH 43947

Toledo Stellantis Mopar Custom Shop
New Construction - 500,000 SF
Design
$23,000,000 est. value
Toledo, OH 43608

Intel
New Construction
Post-Bid
$20,000,000,000 est. value
Johnstown, OH 43031

M4 Knick Industrial
Renovation
Post-Bid
$1,000,000 est. value
Milford, OH 45150

Emerson Climate Technologies
Renovation, Addition - 91,831 SF
Construction
$100,000,000 est. value
Sidney, OH 45365

Dupont Circleville Works
New Construction - 65,000 SF
Construction
$220,000,000 est. value
Circleville, OH 43113

Centor, Inc.
New Construction - 37,000 SF
Pending Verification
$8,500,000 est. value
Millersburg, OH 44654

Winesburg Pallet
Renovation, Addition - 81,600 SF
Pending Verification
$3,500,000 est. value
Dundee, OH 44624

Creative Millwork`s Addition
New Construction
Conception
Ashtabula, OH 44004

Project Boron
New Construction - 156,775 SF
Design
Cleveland, OH 44103

Maplecrest Industrial Project
Renovation
Post-Bid
$100,000 est. value
OH

General Motors Engine Plant
New Construction - 251,000 SF
Construction
$175,000,000 est. value
Brookville, OH 45309

Wheatland Tube Renovation
New Construction, Renovation - 83,000 SF
Pending Verification
$30,000,000 est. value
Warren, OH 44483

Last Updated 07/11/2022 02:53 PM
Project Title

Aglamesis Brothers Expansion

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45214   (Hamilton County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 7,000 square foot chocolate manufacturing facility. As of July 8, 2022, this project is in the early planning stages. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, operations could start in fall 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Manufacturing/Processing Plant, 7,000 SF Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents