Similar Projects
Western Corridor Water and Sewer Main Extension
Infrastructure
Bidding
$14,500,000 CJ est. value
Stuart, FL 34994

Continuing Plumbing Services on a Task Authorization Basis
Term Contract
Sub-Bidding
Kissimmee, FL 34741

Plumbing Services, Time and Material, Term Contract
Term Contract
Sub-Bidding
West Palm Beach, FL 33401

Justice Center Tower Plumbing Replacement
Renovation
Post-Bid
Fort Myers, FL 33901

Hot Water System Replacement South Machine Room Completion of Project
Alteration
Post-Bid
Daytona Beach, FL 32114

Valve Exercise and Unidirectional Flushing
Term Contract
Results
$1,800,000 est. value
FL

Sources Sought - GSA, Region 4, Tampa, Design-Build Closed Loop Side Stream Filtration System, Water Source ACS and Piping Replacement
Results
$250,000 to $500,000 est. value
Tampa, FL

Plumbing Repair and Maintenance Services
Term Contract
Sub-Bidding
Tavares, FL 32778

Marion County Jail Repairs - Plumbing, Windows, Door Controllers
Alteration
Post-Bid
Ocala, FL 34475

Commercial Plumbing Service and Fire Sprinkler Repair and Parts Services
Alteration
Results
Orlando, FL

Plumbing Supplies
Term Contract
Sub-Bidding
Tampa, FL 33607

Tub Replacement
Alteration
Post-Bid
Okeechobee, FL 34974

Continuing Plumbing Projects on a Task Authorization Basis
Term Contract, Alteration
Results
Kissimmee, FL

Annual Plumbing Services for Various Public Buildings
Term Contract
Sub-Bidding
Jacksonville, FL 32202

Plumbing Repairs, Maintenance and Emergency Services
Alteration
Post-Bid
Fort Pierce, FL

Last Updated 02/20/2023 09:01 AM
Project Title

Resurfacing

Physical Address View project details and contacts
City, State (County) Bartow, FL 33830   (Polk County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $7,937,275 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties : Polk Road Name: SR 700 Limits: 16040000 Project(s): 44547015201(*) Federal Aid No: N/A Project(s): 44547115201(*) Total Roadway Length: 8.453 Miles Contract Days: 225 Total Bridge Length: 0.000 Miles Total Proposal Length: 8.453 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days (acq. time) The Work under this contract consists of MIlling and resurfacing, base work, shoulder treatment, drainage improvements, shoulder gutter, tree removal, and signing and guardrail and pavement markings on State Road 700 (US 98) from keller road to west of ridge road and SR 700 (US) 98 from east of Mount zion road to east of Old Stokes Road, in Polk county. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. FLDOT - Call Order : 003 -Resurfacing

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents