Similar Projects
96-inch Main Relocation, Isolation Valves Installations, and New Parallel Main - 122004 - Great Lakes Water Authority
Infrastructure
Conception
$116,168,000 CJ est. value
North Lakeport, MI 48059

Parks and Recreation Master Plan - Fort Gratiot Township
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Fort Gratiot, MI 48059

Cawood Honda
Addition, Infrastructure - 3,485 SF
Design
$920,040 CJ est. value
Port Huron, MI 48060

Grove Avenue Mixed-Use / Port Huron
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Port Huron, MI 48060

Court and Tunnel Street Area Resurfacing
Infrastructure
Bidding
$200,000 CJ est. value
Port Huron, MI 48060

Court and Tunnel Street Area Resurfacing
Infrastructure
Bidding
$200,000 CJ est. value
Port Huron, MI 48060

Anchor Bay School District - High School Additions
Addition, Renovation, Infrastructure - 27,000 SF
Sub-Bidding
$5,200,000 CJ est. value
Ira, MI 48023

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

2022 St. Clair County Chip Seal Program
Alteration
Results
$1,157,000 est. value
Saint Clair, MI

2022 Street Resurfacing
Alteration
Results
Saint Clair, MI

Desmond Landing
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Port Huron, MI 48060

Desmond Landing
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Port Huron, MI 48060

Marine City Storage Cold Storage Phase 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Marine City, MI 48039

Acquisition/Rehabilitation/Disposition Housing Project
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Port Huron, MI 48060

Last Updated 08/21/2023 05:07 AM
Project Title

Concrete Pavement Repairs and Pavement Markings on Fred W Moore Highway

Physical Address View project details and contacts
City, State (County) Saint Clair, MI 48079   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $217,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

0.31 mi of concrete pavement repairs and pavement markings on Fred W Moore Highway from 7th Avenue to Clinton Avenue in the city of St. Clair, St. Clair County. This is a Local Agency project. Net classification required for this project is 217 Ba or 217 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ba and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No STUL 77000 218239A 23A0707 MI DOT - 2309 023 - Concrete Pavement Repairs and Pavement Markings on Fred W Moore Highway

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents