Similar Projects
Dinosaur Discovery Museum Parking Lot Resurfacing Project
Infrastructure
Bidding
$200,000 est. value
Kenosha, WI 53140

East Parking Lot
Post-Bid
Bristol, WI 53104

Traffic Signal Led Modules
Infrastructure
Post-Bid

Parking Lot E Stabilization and Paving
Results
Less than $255,000 est. value
Kenosha, WI 53144

Brighton ES Blacktop and Concrete in the Parking Lot and Playground
Infrastructure
Results
Kansasville, WI 53139

Automatic Traffic Recorder (ATR) Station Installation and Maintenance Statewide
Alteration
Post-Bid

Remove And Dispose Of Asbestos Containing Material And Universal Waste, Raze Structure(S), And Restore Lot(S)
Demolition, Term Contract
Results
Kenosha, WI

Work Zone Traffic Control Items
Infrastructure
Post-Bid

Kenosha County Administration Building Parking Lot
Infrastructure
Results
Kenosha, WI 53140

2022 Paving Program Utility Adjustment and Curb Repair
Infrastructure
Post-Bid
WI

Sidewalk and Curb/Gutter Program (South)
Infrastructure
Results
Kenosha, WI

Parking Lot Repairs
Infrastructure
Post-Bid
Kenosha, WI 53144

Sidewalk and Curb/Gutter Program (North)
Infrastructure
Results
Kenosha, WI

Parking Lot C Repairs
Infrastructure
Post-Bid
Kenosha, WI 53144

16th Street and 34th Avenue (Hunter`s Ridge) Resurfacing
Infrastructure
Results
Kenosha, WI 53140

Reported 07/15/2022 12:00 AM
Project Title

Construction of the Prairie Highlands Shared Use Path Project

Physical Address View project details and contacts
City, State (County) Pleasant Prairie, WI   (Kenosha County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $560,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of Pleasant Prairie hereby gives notice that sealed Bids will be received for the construction of the Prairie Highlands Shared Use Path project. The Project consists of one prime Contract and generally consists of the following: 11,000 feet of 8' to 10' wide asphalt path with gravel base, common excavation, clearing and grubbing, box culverts, hydrant relocates, site restoration, traffic control and construction staking.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents