Similar Projects
O'Reilly Auto Parts (BRD)
New Construction - 6,800 SF
Conception
$500,000 to $900,000 est. value
Bullard, TX

O'Reilly Auto Parts (BD2)
New Construction - 6,800 SF
Conception
$500,000 to $900,000 est. value
Bullard, TX

Kohl's Sephora
Renovation - 2,500 SF
Design
$300,000 est. value
Tyler, TX

Walmart Neighborhood Market #4605-217 - FET 5
Renovation - 41,117 SF
Design
Tyler, TX 75703

Walmart 0-3--TENANTBID--2021 - Bundle #3
Renovation
Post-Bid

Walmart Supercenter #1022-245 - SPRB-R
Renovation
Post-Bid
Tyler, TX

Springhill Suites
New Construction - 64,000 SF
Construction
$7,500,000 est. value
Lindale, TX 75771

Walmart Supercenter #2688-250 - D9 Gun Removal
Renovation - 20,865 SF
Construction
$10,432 est. value
Tyler, TX 75703

JoAnn Fabrics
Build-Out - 28,967 SF
Design
$1,000,000 est. value
Tyler, TX

Target T-0775
Renovation
Post-Bid
Tyler, TX 75703

Downtown Tyler Hotel
New Construction
Construction
Tyler, TX 75702

Walmart Supercenter #1022-250 - D80 BLST CHIL
Renovation - 203,622 SF
Design
Tyler, TX 75704

Walmart Supercenter #3764-603 - CAPXREF-2
Renovation
Post-Bid
Lindale, TX 75771

Walmart Supercenter #2688-249 - SPRB-R
Renovation - 208,653 SF
Construction
$1,254,211 est. value
Tyler, TX 75703

Walmart Supercenter #6467-279 - D80 BLST CHIL
Renovation - 186,907 SF
Design
Tyler, TX 75702

Reported 06/24/2022 09:33 AM
Project Title

Tyler Union Station

Physical Address View project details and contacts
City, State (County) Tyler, TX 75702   (Smith County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel, Retail
Contracting Method
Project Status Obtained from a Public Office, Construction Start Expected August 2022, Construction Completion Expected April 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use. Rehabilitation of Historical (registered) Bus Station to become hotel & retail occupancies, gut & refinish interior with new MEP, new doors & windows, new fixtures, regrade & replace portion of parking lot & sidewalk paving. As of June 23, 2022, no applications have been submitted for building permits. An architect has been selected; however, a general contractor or selection method is not disclosed. Although a firm timeline cannot currently be established, construction is not expected to commence prior to third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Retail, Renovation, Hotel/Motel, Renovation, 9,000 SF Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Coiling Doors and Grilles, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Special Function Windows, Security Windows, Door Hardware, Access Control Hardware, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Seating, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents