Similar Projects
Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

New Park East Lane
Infrastructure
Post-Bid
Scottsville, KY

Lawn Care, Mulching, and Spraying
Term Contract, Alteration
Post-Bid
Florence, KY

Baseball Field Backstop Safety System
Results
Union, KY 41091

Walton-Verona Elementary School Paving Improvements 2021
Infrastructure
Results
Less than $245,500 est. value
Verona, KY 41092

Florence Apartments
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Florence, KY 41042

Target Drive Up Expansion
Infrastructure, Build-out
Pending Verification
$300,000 CJ est. value
Florence, KY 41042

Residence Inn by Marriott / Florence
New Construction, Infrastructure - 104,321 SF
Pending Verification
$20,000,000 CJ est. value
Florence, KY 41042

Address Pavement Condition of AC Pavement
Infrastructure
Conception
$4,000,000 CJ est. value
Glasgow, KY 42141

Langley Bullock Industrial Development / Hebron
New Construction, Infrastructure - 230,000 SF
Design
$123,510,000 CJ est. value
Hebron, KY 41048

Last Updated 03/08/2023 08:35 AM
Project Title

Asphalt Pavement and Roadway Rehab

Physical Address View project details and contacts
City, State (County) Hartford, KY 42347   (Ohio County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,853,483 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 7, 2023, this project were rejected. No definite date for the rebid.** Ohio County HSIP 5079(003) : Kentucky Highway 69 (Ky 69) (Mp 16.835) From 0.85 Mile Northeast of Ky 6122 Extending Northeast to 1.06 Miles Northeast of Ky 878 (Mp 25.095), a Distance of 8.26 Miles. Asphalt Pavement & Roadway Rehab. SYP NO. 02-09015.00. The Dbe Participation Goal is 7.00%. Minimum Wage Rates for These Forgoing Projects Have Been Predetermined by the Secretary of Labor and Are Set Forth in the Proposals. The Department of Highways Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation, and Will Not Be Discriminated Against on the Ground of Race, Color, or National Origin on Consideration for an Award. The Special Provisions of Highway Projects Financed With Federal Highway Funds Applies to Federal Aid Projects. These Forgoing Projects Contain a Percent That is Designated for Disadvantaged Business Enter- Prises (Minority Owned and Women Owned Businesses). See Proposal for Details. Proposals for These Projects Will Be Available at the Division of Construction Procurement Website. Contractors Must Register for Each Project They Intend to Bid. The Bidder Registration Form is Available on the Website. The Department Will Only Accept Bid Registration Forms From Contractors Who Are Prequalified in the Work Categories of the Particular Project. Registration Will Be Closed at 3:00 Pm on the Day Preceding the Letting. KYDOT - Call 102 Asphalt Pavement and Roadway Rehab GOALS FOR MINORITY PARTICIPATION IN EACH TRADE 3.5% GOALS FOR FEMALE PARTICIPATION IN EACH TRADE 6.9%

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents