Similar Projects
New Police Department Headquarters
Renovation
Conception
$2,000,000 to $3,000,000 est. value
Logansport, IN 46947

Fire Station - City Of New Albany
New Construction
Conception
$3,500,000 est. value
New Albany, IN 47150

New Fire Station
New Construction
Design
$7,100,000 est. value
McCordsville, IN

Holton Storm Shelter Rebid
New Construction, Infrastructure - 2,336 SF
Design
$649,222 CJ est. value
Holton, IN 47023

Lawrence Fire Station Number 38
New Construction
Post-Bid
Lawrence, IN 46226

Central State Adaptive Reuse
Renovation, Alteration
Post-Bid
Indianapolis, IN

Design/Build Contractors - Fire Station
New Construction
Results
IN

New Fire Station for Ohio Township Fire Station #2 & New Ohio Township Offices: Building Package
New Construction
Results
Newburgh, IN 47630

Evansville Police Department Storage Building
New Construction, Infrastructure
Construction
$2,243,460 CJ est. value
Evansville, IN 47711

Hybrid Dorm-Apartment Complex
New Construction, Demolition
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Terre Haute, IN 47803

City of Carmel Police Headquarters Expansion
Demolition, New Construction, Infrastructure, Build-out
Pending Verification
$34,600,000 CJ est. value
Carmel, IN 46032

New Albany Police Station / New Albany
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
New Albany, IN 47150

Decontamination and Maintenance Facility
New Construction
Post-Bid
Indianapolis, IN 46268

Fire Department - Station 97
New Construction
Results
Fishers, IN

Martinsville Police Station
New Construction, Infrastructure - 14,000 SF
Design
$5,500,000 CJ est. value
Martinsville, IN 46151

Last Updated 04/21/2023 01:11 PM
Project Title

Outright Purchase & Erection of Flashover Simulator for Indianapolis Fire Department

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46235   (Marion County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $82,472 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For Flashover Simulator for the Indianapolis Fire Department Written Questions Due Date: July 14, 2022 at 12:00 noon Eastern Time preferably by email to: andy.sparks@indy.gov That Bidder and its management personnel possess any and all professional trade licenses required by law for any trade or specialty area in which Bidder is seeking a contract award, and said licensures have not been suspended or revoked within the previous five (5) years; For contracts estimated to be over $300,000.00, that Bidder and expected subcontractors are qualified under IC 4-13.6-4 or IC 8-23-10. Ifthe Bidder Is the apparent low bidder, it will be required to submit proof of those certifications within 72 hours of bid-opening.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents