Similar Projects
CON EHRM Infrastructure Upgrades - St John CBOC - New Orleans, LA
Term Contract
Design
$25,000 to $100,000 est. value
LA 70084

Replace Transformer and Correct Electrical Deficiencies
Term Contract
Design
$500,000 to $1,000,000 est. value
Shreveport, LA 71101

2021 Wood Pole Inspection and Treatment Project
Alteration
Bidding
$95,000 est. value
LA

Combustion-Turbine Generator 7 Procurement
Alteration
Bidding
LA

H259--667-21-4-501-0386, Tri-Annual Switchgear Testing (Va-21-00048177)
Term Contract
Post-Bid
Shreveport, LA 71101

OCS Pole Replacement
Alteration
Post-Bid
New Orleans, LA

Preventative Generator Maintenance
Alteration
Results
Baton Rouge, LA

Duck Pond Aeration Fountains and Lighting
Alteration
Results
$50,000 est. value
Shreveport, LA

Electrical Line Construction
Alteration
Bidding
LA

Disassemble Current UPS System and Install New UPS System and Battery Cabinet
Alteration
Post-Bid
New Orleans, LA

Texas Street Bridge Lighting Installation
Alteration
Results
$750,000 est. value
Shreveport, LA

Emergency Generator Installations at Various Sites in the Kisatchie Wellfield
Alteration
Bidding
LA

2021 Purchase of Two, Four Way 600amp Switchgear
Alteration
Post-Bid
Lafayette, LA

Hurricane Laura (Dr-4559-La) Disaster Recovery Program Water Treatment Plants – Chemical Feed System Repairs
New Construction, Alteration
Results
$450,000 est. value
Lake Charles, LA 70601

Steel Transmission Pole Restoration
Alteration
Bidding
LA

Reported 01/14/2022 12:00 AM
Project Title

Bayou Chene Flood Protection Structure Phase 5 - Shore Power

Physical Address View project details and contacts
City, State (County) Morgan City, LA   (Saint Mary County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installing a high voltage electrical service line on Avoca Road. The total length of the project is 18,061 linear feet. The project will begin at an existing Cleco Power pole and will end at the Bayou Chene Structure where the anticipated power draw will be 800 Amps

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents