Similar Projects
Last Updated | 04/03/2023 12:19 PM |
Project Title | Inpatient Room Improvements at Corrigan Mental Health Center - GC |
Physical Address | View project details and contacts |
City, State (County) | Fall River, MA 02720 (Bristol County) |
Category(s) | Medical |
Sub-Category(s) | Medical Office/Outpatient |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $407,981 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 20, 2023 this project still not awarded. For Inpatient Room Improvements at Corrigan Mental Health Center - GC Location- 49 Hillside Street Fall River, Massachusetts 02720 Contractor Qualification DCAMM Certificate Estimated Construction Cost: $293,000. The work described under this Contract is for the material and labor for the upgrades work in an inpatient unit room at the Corrigan Mental Health Center, located at 49 Hillside Street, Fall River, MA 02720. Convert an area of the facility into a negative pressure room with a private bathroom, both compliant with the Massachusetts Architectural Access Board regulations and anti-ligature standards.Installation of new anti-barricade door systems as noted in drawings. Provide labor and material to install new gypsum wall and ceilings, as noted in drawings. New flooring and finishes. Miscellaneous patching and repair. Disconnection of any electrical, alarms, security as required to complete renovation work and to reconnect everything that hasn't been replaced when the project is completed. Furnish and install all finish work as noted within the plans and specifications including but not limited to the following items: electrical, floor repair, carpeting, doors, painting, ceilings, lighting, electrical/cabling, plumbing, all HVAC improvements as detailed in the plans and specifications, etc. Coordination of the HVAC installation with the contractor who will be doing the contracted work. Repair, patch and/or replace any materials damaged by the demolition and installation of the new work. PROJECT NO. 22074.00 |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |