Similar Projects
Highway Construction - CTH N - STH 59 to County Line - Rock County
Infrastructure
Conception
$8,550,000 CJ est. value
Whitewater, WI 53190

Highway Construction - CTH N - STH 59 to County Line - Rock County
Infrastructure
Conception
$8,550,000 CJ est. value
Whitewater, WI 53190

St. Patrick's Church
Addition, Demolition, New Construction, Infrastructure - 9,278 SF
Design
$3,500,000 CJ est. value
Elkhorn, WI 53121

St. Patrick's Church
Addition, Demolition, New Construction, Infrastructure - 9,278 SF
Design
$3,500,000 CJ est. value
Elkhorn, WI 53121

Vanderlip Pumping Station and Force Main Replacement Rebid
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Whitewater, WI 53190

Vanderlip Pumping Station and Force Main Replacement Rebid
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Whitewater, WI 53190

2022 Road Improvements
Infrastructure
Post-Bid
$600,000 est. value
Lyons, WI

2022 East Troy Microsurfacing
Infrastructure
Post-Bid
$450,000 est. value
East Troy, WI

2022 Joint and Crack Cleaning/Sealing
Infrastructure
Results
Lake Geneva, WI

2022 Elkhorn Street And Parking Improvements
Infrastructure
Results
Elkhorn, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Meijer / Delavan
Demolition, Term Contract, New Construction, Infrastructure - 160,000 SF
Pending Verification
$30,000,000 CJ est. value
Delavan, WI 53115

Meijer / Delavan
Demolition, Term Contract, New Construction, Infrastructure - 160,000 SF
Pending Verification
$30,000,000 CJ est. value
Delavan, WI 53115

Highway Construction - CTH M - Townline Road to STH 59 - Rock County
Infrastructure
Conception
$500,000 CJ est. value
Whitewater, WI 53190

Last Updated 09/15/2023 05:08 AM
Project Title

Water Utility Vehicle Storage Garage

Physical Address View project details and contacts
City, State (County) Whitewater, WI 53190   (Walworth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Demolition of two existing garages and site grading and preparation for asphalt paving and a pole building structure on frost wall foundations for vehicle storage. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price. The City of Whitewater reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. Prospective Bidders are required to complete and submit a prequalification questionnaire with supporting documents to OWNER (see Instructions to Bidders). The Strand Associates, Inc.(R) project manager is Evan J. Constant, P.E. and can be contacted at Strand Associates, Inc.(R), 910 West Wingra Drive, Madison, WI 53715, (608) 251 4843, regarding the Project. For further requirements regarding Bid submittal, qualifications, procedures, and Contract Award, refer to the Instructions to Bidders that are included in the Bidding Documents. Pre-Qualification: Yes *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents