Similar Projects
(SS2) 2.6 MG Commerce Drive Settling Pond - City of Saint George
Infrastructure
Conception
$2,014,000 CJ est. value
St George, UT 84790

North Conference Pond (DBW13) - City of Layton
Infrastructure
Conception
$450,000 CJ est. value
Layton, UT 84041

HPER Plaza Reroof - Hazardous Material Abatement
Term Contract, Infrastructure
Design
$400,000 CJ est. value
Salt Lake City, UT 84112

Quinns Water Treatment Plant and Signal Hill Area
New Construction, Infrastructure
Design
Park City, UT 84060

2023 Roadway Maintenance - Crack Seal
Term Contract
Sub-Bidding
$450,000 CJ est. value
Duchesne, UT 84021

Hill AFB Base Integrated Environmental Support Tasks (Biest)
Term Contract
Post-Bid
Hill AFB, UT

Cultural and Environmental MATOC
Term Contract
Post-Bid

CDBG PY21 FY22 Clearance 100 West
Term Contract
Results
Saint George, UT 84770

Asbestos Abatement and Related Services Contract
Term Contract
Results
Farmington, UT

Abatement of Asbestos Fire Doors, Vinyl Tile and Mastic, TSI, Ceiling Tile, Roofing, Sheetrock, HVAC Sealant
Alteration
Post-Bid
Ferron, UT 84523

DFCM Construction- Utah Department of Corrections Draper Prison Site Hazardous Materials Abatement
Term Contract, Infrastructure
Results
$1,380,524 CJ est. value
Draper, UT 84020

Asbestos Abatement at Roy High School Science Rooms
Term Contract
Post-Bid
Roy, UT 84067

RFP Construction Manager - Marina Expansion
Infrastructure
Results
$45,000,000 CJ est. value
Garden City, UT 84028

Cultural and Environmental Resources Services (MATOC) (IDIQ)
Term Contract
Post-Bid

Homeless Camp Abatement
Alteration
Results
$400,000 est. value
Salt Lake City, UT

Last Updated 03/18/2023 06:06 AM
Project Title

LightBloc Motorized FlexShade System

Physical Address View project details and contacts
City, State (County) Farr West, UT 84404   (Weber County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $10,390 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Weber School District is requesting bids for twelve (12) 46" x 4' motorized FlexShade Systems or comparable. The Board of Education, Weber School District, reserves the right to accept or reject any or all quotes or any portion thereof and to waive any abnormalities during the bidding process as the District deems to be in their best interest. Low bid is no way binding upon our district and final selection and honoring of the bids will be made by our office. FlexBloc FlexShade System or comparable. Color: Navy Electric Motor Operator Location: Right Side Surface mount at head Side Channels for installation; Jamb Channels for installation: Sill Switches and plate covers: White Hardware finish: Charcoal Bronze Q & A deadline: Mar 06, 2023 12:00:00 PM EST Entire group can be operated by Master Switch

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents