Similar Projects
RV Roadway of Opelika Service Building
New Construction, Infrastructure - 11,250 SF
Conception
$3,000,000 CJ est. value
Opelika, AL 36801

North College Street Railroad Crossing Sidewalk - City of Auburn
Infrastructure
Conception
$400,000 CJ est. value
Auburn, AL 36830

Parker Creek Townhomes
New Construction, Infrastructure
Design
$5,280,800 CJ est. value
Auburn, AL 36832

Parker Creek Townhomes
New Construction, Infrastructure
Design
$5,280,800 CJ est. value
Auburn, AL 36832

Constructing the Bridge Widening on I-85 (Northbound and Southbound Roadways)
Infrastructure
Bidding
$5,001,240 CJ est. value
Auburn, AL 36830

Constructing the Bridge Widening on I-85 (Northbound and Southbound Roadways)
Infrastructure
Bidding
$5,001,240 CJ est. value
Auburn, AL 36830

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Roundabout at Sportsplex Parkway and West Point Parkway
Infrastructure
Post-Bid
Opelika, AL 36801

Facilities Management Training Center - New Facility
New Construction, Infrastructure - 9,600 SF
Results
$2,071,279 CJ est. value
Auburn Univ, AL 36849

New Connector Road from SR-14 (Martin Luther King Drive) to Richland Road
Infrastructure
Results
Auburn, AL 36832

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

Opelika Road Water Improvements Phase II & III - City of Auburn
Infrastructure
Conception
$450,000 CJ est. value
Auburn, AL 36830

Last Updated 07/26/2023 08:04 AM
Project Title

Constructing the Safety Improvements (Safety Widening, Resurfacing, Guardrail Improvements, and Traffic Stripe) on Cr-379

Physical Address View project details and contacts
City, State (County) Auburn, AL 36804   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $264,200 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this Section covers the general requirements that are applicable to all types of hot and warm mix asphalt pavements of the plant mix type. Deviations from these general requirements will be indicated in the specific requirements for various types of mixes noted in the following sections of these Specifications. This work shall consist of one or more courses of hot and warm mix asphalt plant mix constructed in accordance with these specifications and the specific requirements of the type of mixture required and in reasonably close conformity with the lines, grades, thicknesses, and typical cross sections shown on the plans or established by the Engineer. The Contractor may use either hot mix or warm mix for all Superpave ESAL Range mixes in Sections 420, 423, and 424. Warm mix asphalt shall be defined as the use of an approved warm mix technology in the plant mix at the time of production DBE Goal Percent: 0.50 Contract Time: 30 Working Days for constructing the Safety Improvements (Safety Widening, Resurfacing, Guardrail Improvements, and Traffic Stripe) on CR-379 from the junction of CR-798 to the junction of CR-372. Length 1.335 mi. The Bracket Estimate on this project is from $216,163 to $264,200. If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 011 - Constructing the Safety Improvements (Safety Widening, Resurfacing, Guardrail Improvements, and Traffic Stripe) on Cr-379 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents