Similar Projects
Master As-Needed Agreement M15 Electrical Services
Alteration
Bidding
$700,000 est. value
San Francisco, CA

Millbrae Recreation Center - Low Voltage Systems Installation
Infrastructure
Bidding
Millbrae, CA 94031

H--LBAO Generator Maintenance Services
Term Contract
Post-Bid
Carson City, Nixon, NV 89424

Emergency Backup Generator
Alteration
Post-Bid
CA

Better Way Electrical Service or HVAC Project
Alteration
Results
$100,000 to $300,000 est. value
Yuba City, CA 95991

PW Transit As-Needed Contract No. 2
Infrastructure, Alteration
Results
$3,000,000 est. value
San Francisco, CA

Phase II District-Wide Building Automation HVAC Systems and Lighting
Alteration
Bidding
Concord, CA

Uninterruptable Power Supply (UPS) Systems
Alteration
Post-Bid
Fresno, CA

2210 Napa-Vallejo Highway Temporary Construction Power
Alteration
Results
$75,000 est. value
Napa, CA 94559

Electrical Conditions Assessment and Developing Preventative Maintenance Plan Prospective Consultants
Alteration
Bidding
Jurupa Valley, CA 91752

Generators For Water And Wastewater Facilities
Infrastructure
Post-Bid
Santa Rosa, CA

Installation of Owner Furnished Outdoor LED Signs at Six (6) Sites
Alteration
Results
Banning, CA 92220

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Bidding
Los Angeles, CA 90081

Jameson Pump Station VFD Replacement and Pump Station Emergency Power Transfer and Generator Connection Improvements
Alteration
Post-Bid
Fairfield, CA 94534

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

Reported 09/29/2021 12:00 AM
Project Title

High Voltage Improvements At Sutter Waste Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Modesto, CA 95351   (Stanislaus County)
Category(s) Industrial/Manufacturing, Single Trades
Sub-Category(s) Electric, Power Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $510,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace High Voltage Electrical Systems at the Sutter Wastewater Treatment Plant to address MID electrical protection requirements.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents