Similar Projects
Metropolitan Correctional Center (MCC) Chicago unit 13 Upper and Lower Shower Renovation
Renovation
Sub-Bidding
$100,000 CJ est. value
Chicago, IL 60605

CPS Lake View Interior Lock Rekey
Alteration
Post-Bid
Chicago, IL

Bridgeview Courthouse Tenant Improvements
Alteration
Post-Bid
Bridgeview, IL 60455

Stair Improvements at Elgin High School
Alteration
Results
Elgin, IL 60120

GSA - DOS Carpet and Paint at JCK Federal Building
Renovation, Term Contract
Results
Chicago, IL 60604

Removal and Replacement of Monoglass Insulation
Alteration
Post-Bid
Rosemont, IL

Hattie Callner Interior
Renovation, Alteration - 90,762 SF
Results
Chicago, IL 60657

County Building Facade Inspection
Infrastructure, Alteration
Post-Bid
Chicago, IL

Water Treatment Plant Pipe Gallery Staircase Replacement
Alteration
Results
Chicago, Western Springs, IL 60558

Structural Support Repair
Alteration
Post-Bid
Morton Grove, IL

Vivian Gordan Harsh Apartment Interior
Renovation, Alteration
Results
Chicago, IL 60653

Interior Waste Bins Installation
Alteration
Post-Bid
South Holland, IL 60473

Vivian Carter Apartments Interior Renovation
Renovation, Alteration
Results
$250,000 est. value
Chicago, IL 60621

APMS Casework
Alteration
Post-Bid
Oak Forest, IL 60452

METRA Station Retractable Wall Design and Installation
Alteration
Results
Oak Park, IL 60301

Last Updated 11/30/2022 03:05 PM
Project Title

Capital Improvements Phase 2 - Sequence 2 - BP-02L to 26L

Physical Address View project details and contacts
City, State (County) Hillside, IL 60162   (Cook County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Construction Manager - 10/17/22
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install a new air Education of Proviso Township for Notification conditioning OF BID system for the 1st High School District 209, is FOR floor classrooms receiving lump sum proposals Proviso School District 209 - Capital Improvements - Misc. Demolition Phase 2 - Sequence 2 from interested contractors for - New curtainwall 1st floor south Gilbane the Proviso Building Company, School Construction District Manager, Capital for and acting on behalf of The Board of Education of Proviso Township High School District 209, is receiving lump sum proposals side. from interested contractors for the Proviso School District Improvements Capital Improvements Project. This release This includes the following: - Renovate science classroom release includes the following: EAST (See specific bid packages listed below) spaces PROVISO - Furnish and EAST install a (See new air specific conditioning system bid for the 2 nd floor south classrooms and office spaces. As well as PROVISO MATH AND SCIENCE system on the entire 1 st floor. packages new air conditioning listed below) ACADEMY (see specific bid - Misc. Demolition - Furnish and install a new air packages listed below) PROVISO conditioning WEST (See specific system bid packages for listed the below) 2nd - Furnish floor and south install a new classrooms air conditioning system and for the - 1 st floor Furnish classrooms and install preengineered building that will serve - Misc. Demolition office spaces. As well as new air - New curtainwall 1 st floor south side. as the school's salt shed. conditioning - Renovate science system classroom on spaces the entire 1st floor. PROVISO MATH AND SCIENCE ACADEMY (see specific bid packages listed below) - Misc. - Furnish Demolition and install pre-engineered building that will serve as the school's salt shed. BP # DESCRIPTION BP# DESCRIPTION 02L Demolition Work 12C Salt Shed - Proviso - Proviso East Math and Science 02M Demolition Work - Proviso West 22H Plumbing Work - Proviso East/Proviso West 06K General Trades Work - Proviso East 23T Mechanical Piping Work - Proviso East 06L General Trades Work - Proviso West 23U Mechanical Piping Work - Proviso West 08D Storefront Curtainwall Work - Proviso West 23V Mechanical Ductwork/Temp Controls - Proviso East 09L Acoustical Ceiling Work - Proviso East 23W Mechanical Ductwork/Temp Controls - Proviso West 09M Acoustical Ceiling Work - Proviso West 23X Mechanical Insulation Work - Proviso East 09N Painting Work - Proviso - Proviso East 23Y Mechanical Insulation Work - Proviso West 09O Painting Work - Proviso - Proviso West 26K Electrical Work - Proviso East 12B Lab Casework - Proviso West 26L Electrical Work - Proviso West workers and mechanics performing Bid security The in proposals the form of a bid will bond in be an amount due equal on to ten services percent (10%) on of the public base bid works is required projects from all bidders. no Guarantee November Bonds 30, in the 2022 form of at a 10:00 Performance a.m. Bond local and Labor and Material Payment Bond in an amount equal to one less than the "prevailing rate of wages" (100%) of the will be required from the awarded Bidder. hundred time via percent website. (hourly cash wages plus fringe benefits) The To work bid will this be done project, in accordance bidders with should the Contract in Documents. the county "Failure Where to Comply the Work With the is Requirements of This Invitation to Bid May Result in the Disqualification of the with Gilbane Building performed. For information regarding BIDDER". prequalify Company via Compass at website. The refer to the Illinois Department of bid proposals are to be completed Labor's website. All contractors Bid security in the form of a bid bond in and subcontractors rendering services an amount equal to ten percent (10%) of the base bid is required from all under this contract must comply with all requirements of the Act, including bidders. Guarantee Bonds in the form but not limited to, all wage, notice and of a Performance Bond and Labor and record keeping duties. Material Payment Bond in an amount equal to one hundred percent (100%) The Proviso Township High School of the bid will be required from the District 209 and Gilbane Building awarded Bidder. Company reserve the right to reject any or all bids. All information submitted as The work will be done in accordance with the Contract Documents. part of this process shall be considered "Failure to Comply With public information under the State The Requirements of This Freedom of Information Act unless Invitation to Bid May Result specifically disclosed on the applicable In the Disqualification of the information by the Bidder. Challenges to such exemptions shall be defended Bidder".

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents