Similar Projects
Range Sustainment and Remediation Environmental Services
Term Contract
Design
Less than $95,000,000 est. value

Range Sustainment and Remediation Environmental Services
Term Contract
Design
Less than $95,000,000 est. value

Environmental Remediation Firms
Post-Bid
Santa Ana, NM 87004

Multiple Environmental Government Acquisition(Mega) Formerly Used Defense Sites (Fuds) Military Munitions Response Program (Mmrp) Multiple Task Order Award (MATOC) Small Business Set-Aside
Post-Bid
$2,500 to $75,000,000 est. value

Wastewater Collection System Expansion
Results
Edgewood, NM

Mesquite-Brazito Wastewater System Improvements
Results
Less than $6,101,583 est. value
La Mesa, NM

Lea County Airport Water and Sewer Extension
Post-Bid
Hobbs, NM 88240

Village Sewer Line Improvement Project
Results
$6,874,096 est. value
Albuquerque, NM 87105

Wastewater System Improvements
Post-Bid
Maxwell, NM

Lincoln NF, Sacramento Peak Communication Site Improvement
Results
Cloudcroft, NM 88317

On-Call Utility Repair
Post-Bid
Los Alamos, NM

Grease Trap Cleaning Services
Results
Alamogordo, NM 88103

On Call Utility Repair Services
Infrastructure
Post-Bid
Roswell, NM

Construction of NM 76 Area Sewer Improvements
Results
Espanola, NM 87532

Environmental Remediation MAIDIQ (ERMA FY23)
Term Contract
Post-Bid

Reported 03/11/2022 12:00 AM
Project Title

Hazard Mitigation and Stabilization for Sewer Lines

Physical Address View project details and contacts
City, State (County) Ruidoso, NM 88345   (Lincoln County)
Category(s) Environmental, Sewer and Water
Sub-Category(s) Sanitary Sewers, Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $15,000,000 to $20,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Sewer Line Hazard Mitigation and Stabilization project purpose is to mitigate future hazard from major storm events by protecting the sanitary sewer line from river erosion, degradation and meander. There will be 40 sites, along 12 miles of the Rio Ruidoso. Project work will include excavation of river and adjacent areas, downstream of sewer line river crossings and along the banks of the Rio Ruidoso. Scope of work for the existing sewer line includes installing nee flood and structural encasement to protect the sewer line; lowering and encasing the sewer line; installing grouted boulder grade control structures, grouted boulder bank protection, scour walls, and dumped river rock boulder channels to protect the sewer line; and protecting the river bank and manholes with stabilization and armoring. New sewer line sections, manholes, and encasement will also be installed. Additionally, the project will also include stream bank restoration, reseeding and planting of disturbed areas after construction.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Wetlands.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents