Similar Projects
Hyatt Place
New Construction - 77,034 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Duluth, GA

Hilton Atlanta Marietta Hotel and Conference Center
Renovation
Conception
$15,000,000 est. value
Marietta, GA 30064

The Center for Advanced Surgical Services (CASS)
New Construction - 580,600 SF
Design
$100,000,000 est. value
Atlanta, GA 30303

Hilton Garden Inn/Home2 Suites Hotel
Design
Marietta, GA

Centennial Yards Pre-Construction Services
Bidding
Atlanta, GA

Centennial Yards Pre-Construction Services
Bidding
Atlanta, GA

Dunkin'
Build-Out - 1,820 SF
Bidding by Invitation
$275,500 est. value
Atlanta, GA 30309

Ruth`s Chris Steak House
Renovation - 2,915 SF
Sub-Bidding
Atlanta, GA 30326

Waldo's Old Fourth Ward
New Construction - 186,064 SF
Post-Bid
Atlanta, GA

Waldo's Old Fourth Ward
New Construction - 186,064 SF
Post-Bid
Atlanta, GA

Citizens Trust J-Deck Waterproofing Improvements
Results
Atlanta, GA 30303

Parking Deck “A” Improvements
Results
Atlanta, GA 30303

Mountain Walk Townhomes
New Construction, Renovation - 8,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Marietta, GA

Mountain Walk Townhomes
New Construction, Renovation - 8,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Marietta, GA

Staybridge Suites
New Construction
Pending Verification
Kennesaw, GA

Last Updated 12/28/2018 08:43 AM
Project Title

Phipps Plaza Mixed-Use Redevelopment

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30326 (Cobb, Fulton Counties)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Food/Beverage Service, Hotel/Motel, Office, Parking Garage
Contracting Method
Project Status Permitting
Bids Due View project details and contacts
Estimated Value $200,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 390,000 SF - Office, 12 Stories Above Grade, 300,000 SF New Construction, Fitness Center, 90,000 SF New Construction, Hotel/Motel, New Construction, 150 Unit(s), Food/Beverage Service, Build-Out, Parking Garage, 4 Stories Above Grade, 484,313 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents