Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Pavement Rehabilitation - SH 1
Infrastructure
Design
$1,500,000 CJ est. value
Ada, OK 74820

Bridge Rehabilitation - SH 1
Infrastructure
Bidding
$3,549,088 CJ est. value
Ada, OK 74820

Construction of Two (2) Emergency Housing Units
New Construction, Infrastructure
Bidding
$450,000 CJ est. value
Ada, OK 74820

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Waterline Relocation
Infrastructure
Results
$50,000 to $54,000 est. value
OK

Water System Improvements Water Meter Project
Infrastructure
Results
$400,000 est. value
Fittstown, OK

Hayes School Replacement - 2021 Bond - Ada City School District
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Ada, OK 74820

New Elementary and Gym Addition
Addition, Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Stonewall, OK 74871

Overlay Road Project for Three (3) Miles on Thomas Ranch Road (Pontotoc County District #1
Infrastructure
Post-Bid
$850,000 CJ est. value
Ada, OK 74820

Water Line Improvements
Infrastructure
Results
$1,453,390 CJ est. value
Francis, OK 74844

Irving Center Exercise Pad and Walking Trail
Infrastructure
Post-Bid
$80,000 CJ est. value
Ada, OK 74820

Widen, Resurface, and Bridge SH-99
Infrastructure
Results
$12,464,193 CJ est. value
Ada, OK 74820

New Structure on North End of Property
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Ada, OK 74820

Last Updated 01/23/2023 03:33 PM
Project Title

Utilities

Physical Address View project details and contacts
City, State (County) Ada, OK 74820   (Pontotoc County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $81,370 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-1: Over Two Unnamed Creeks, Begin Approx. 2.19 Mis Ne of Sh-1/hickory St in Roff, Extend Ne to the Chickasaw Tnpk (Ut for 31880(04) As of January 23, 2023 a design team has not been identified. Anticipated letting month/year is June 2022. Length: 1.410 Mi. OKDOT - Utilities *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents