Similar Projects
Warrington Property
New Construction
Conception
Selbyville, DE 19975

Irons Lane Subdivision
New Construction
Conception
Dagsboro, DE 19939

Old Mill Landing South
New Construction
Design
Selbyville, DE 19975

Tower Hill
New Construction
Design
$9,500,000 to $10,000,000 est. value
Lewes, DE 19958

Rehabilitation of Homes Throughout Sussex County
Renovation
Post-Bid
$1,000 to $25,000 est. value
Georgetown, DE 19947

Housing Rehabilitation
Post-Bid
DE

Fenwick Island Light Keepers House– Interior Fit Out
Results
Less than $420,200 est. value
Fenwick Island, DE 19944

Harbor Point
New Construction
Construction
Lewes, DE 19958

Arbor-Lyn
New Construction
Construction
Rehoboth Beach, DE 19971

Stream`s Edge
New Construction
Pending Verification
Lewes, DE 19958

Cool Spring Meadows
New Construction
Conception
Milton, DE

Old Mill Landing North
New Construction
Design
Selbyville, DE 19975

Anchors Run Residential Development
Construction
$4,000,000 est. value
Lewes, DE 19958

Patriots Glen Subdivision
New Construction
Design
Milton, DE

Wellesley
New Construction
Construction
Rehoboth Beach, DE 19971

Last Updated 03/23/2021 10:56 AM
Project Title

The Cove

Physical Address View project details and contacts
City, State (County) Greenwood, DE   (Sussex County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Owner to Subcontract.
Project Status Conceptual Design, Construction Start Expected third quarter 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

38 Single-Family Homes, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents