Similar Projects
Payson Avenue Roadway, Water Main, and Sewer Improvements
Bidding
Quincy, IL 62328

Payson Avenue Roadway, Water Main, and Sewer Improvements
Bidding
Quincy, IL 62328

Central Division – Asphalt Paving Maintenance
Post-Bid

Tar & Chip, Asphalt Milling & Resurfacing
Post-Bid
Quincy, IL 62301

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2020 MFT Maintenance - Asphalt Resurfacing
Results
Less than $1,209,945 est. value
Quincy, IL 62301

Willow Creek & Homestead Subdivisions Pavement Patching - Roadway, Water Main & Sewer Improvements
Bidding
Quincy, IL

Road Patching
Results
IL

Removal and Installation of CSPPA
Bidding
IL

Phase 1 LTCP Maximization
Renovation, Demolition
Results
Quincy, IL 62301

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Bidding

2020 Water Main Extension
Renovation
Results
Less than $420,000 est. value
Quincy, IL 62301

Harrison to Van Buren Roadway, Water Main, and Sewer Improvements
Bidding
Quincy, IL 62301

2020 Sewer Rehab/Grouting
Renovation
Results
Less than $130,312 est. value
Quincy, IL 62301

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Last Updated 02/17/2021 03:02 PM
Project Title

2019 Bond Projects - Phase 2

Physical Address View project details and contacts
City, State (County) Quincy, IL   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,311,066
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of street reconstruction, water main replacement, sewer improvements, and other related items at 5 locations: - Hamann Lane from North 12th to North 18th (Location W1-1) - North 22nd Street from Oak Street to Chestnut Street (Location W2-4) - Washington Street from South 20th to South 24th / South 23rd from Washington to Ohio (Location W4-2) - Adams Street from South 8th to South 10th (Location W7-2) - Kentucky Street from South 2nd to South 3rd (Location W7-4)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents