Similar Projects
Pinecrest Academy Gymnasium
New Construction, Addition - 12,651 SF
Conception
Miami, FL 33185

Christopher Columbus High School
New Construction
Design
Miami, FL 33165

Lawton Chiles Middle School Renovations
Renovation
Bidding
Hialeah, FL 33015

School Board Admin Building Complex - SBAB / Jefferson Annex / Parking Garage - Deferred Maintenance Project
Renovation
Sub-Bidding
Miami, FL 33132

George Washington Carver Middle School Renovations
Post-Bid
Less than $2,799,203 est. value
Coral Gables, FL 33133

Cohea Charter School - Addition - New Classrooms
Addition - 45,880 SF
Post-Bid
Less than $500,000 est. value
Hialeah, FL 33016

MA Milam K-8 Center (Phase 1) - Renovations & PE Shelter Replacement
Renovation
Results
Less than $4,143,452 est. value
Hialeah, FL 33012

Richmond Heights School Renovations
Renovation
Results
Less than $4,090,711 est. value
Miami, FL 33176

John F. Kennedy Middle School Phase I Remodel/ Renovations
Renovation
Construction
Miami, FL 33162

Palmetto Middle School - Band Room Renovations
Construction
Miami, FL 33156

Booker T. Washington Senior High School
Renovation
Post-Bid
Miami, FL 33136

Dr. Toni Bilbao Preparatory Academy Phase II Addition of Middle School Grades 6-8
Addition
Results
Less than $8,459,271 est. value
Doral, FL 33178

North County K-8 Center Remodel/Renovations
Renovation
Construction
Miami Gardens, FL 33056

Cutler Bay Middle School
Post-Bid
Cutler Bay, FL 33157

New School Facility - Grades 6 - 8 and Workforce Housing (Brickell Area)
New Construction
Results
$24,303,607 est. value
Miami, FL 33130

Reported 11/16/2021 12:00 AM
Project Title

Palmetto Middle School - GOB Year (4) Renovations

Physical Address View project details and contacts
City, State (County) Pinecrest, FL 33156   (Miami-Dade County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

Exterior painting of the entire campus (all buildings), selective exterior demolition, new covered walkway, new sidewalks, Building 1 roof replacement, concrete work, repairs and painting to existing sunscreen devices, landscape/sod restoration, selective interior demolition, preparation work at openings to receive new windows, remodeling of several group toilet rooms, Concrete Shell and Masonry Work, Concrete Slab Restoration, steel columns, Light Gage Metal Framing, Architectural Woodwork, Carpentry, Building Insulation, Firestopping, Joint Sealers/Sealants, Steel Doors and Frames, Door Hardware, Window Replacement, Gypsum Wallboard, Metal Lath, Plaster, Stucco, Ceramic Tile, Window Sills, Resilient Tile Flooring, Linoleum Flooring, Rubber and/or Wood Base, Carpet Flooring, Acoustical Ceilings, Painting, Toilet Partitions, Toilet Accessories, Wall Louvers, Electric Hand Dryers, Signage, Fire Extinguishers, Window Treatment, Plumbing, HVAC (including controls and EMS system), Electrical, Intrusion Detection System and Fire Alarm Work.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents