Similar Projects
Last Updated | 02/15/2024 07:03 PM |
Project Title | Casey Canal Improvements Phase 2A |
Physical Address | View project details and contacts |
City, State (County) | Savannah, GA 31401 (Chatham County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $50,921,464 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be done consists of the following generally described items: Consists of drainage structure upgrades with this Casey South drainage Basin. Construction will include the addition and size upgrade of pipe and other drainage structures. This construction also consist of roadway demolition, repair and improvements, and detours. Casey Canal Improvements Phase 2A The work to be done consists of the following generally described items: The proposed project is in the residential area located in the vicinity of 54th, 56th and 57th streets between Abercorn to Harmon streets. It will consist of demolition of the existing streets, construction of new stormwater pipes, manholes and inlets, replacement of 8000 ft existing water mains plus laterals and associated valves/accessories, implementation of erosion control, sampling and reporting during construction and restoration of street pavement. The bids are set up in two phases and five options. (Please see attached exhibit) Phase 2-1: construction along 54th street from Abercorn to Harmon and along Abercorn St. from 55th to 54th Phase 2-1, alternative #1: Micro-tunnel 60" RCP for the most eastern block on 54th between Paulsen to Harmon. Phase 2-2: Construction along 57th from Abercorn to Reynolds, along 56th from Reyolds to Harmon, along Abercorn, Habersham, and Battey from 58th to 57 th and along Reynolds from 58th to 56th. Phase 2-2, alternative #1: use 10x6 box culvert in lieu of double 72" RCP for stormwater pipes. Phase 2-2, alternative #2: micro-tunnel 102" RCP for the most eastern block on 56th street between Paulsen to Harmon. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |