Similar Projects
Treatment Plant Expansion - City of Savannah
Addition, Demolition, Renovation, Infrastructure
Conception
$7,460,000 CJ est. value
Savannah, GA 31401

Stop N Store - Bloomingdale
New Construction, Infrastructure - 82,000 SF
Conception
$8,000,000 CJ est. value
Bloomingdale, GA 31302

Hotel Anne
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Savannah, GA 31401

Rough Grading Improvements Bryan County Megasite
Infrastructure
Design
$600,000 CJ est. value
Savannah, GA 31401

RFP Construction Manager - Construction Management Services for Garden City Gymnasium Complex
New Construction, Infrastructure
Bidding
$14,000,000 CJ est. value
Garden City, GA 31408

Truman Linear Park Trail Phase II-B
Infrastructure
Bidding
$400,000 CJ est. value
Savannah, GA 31415

Convention Center Hotel Development
New Construction, Infrastructure - 160,000 SF
Post-Bid
$4,000,000 CJ est. value
Savannah, GA 31401

RFQ Engineering - L.scott Stell Park Improvements (Parking Lot,Tennis Courts, Pickleball Courts and Basketball Courts)
Renovation, Infrastructure
Post-Bid
$32,900 CJ est. value
Savannah, GA 31419

Sewerage System Rehabilitation
Infrastructure
Results
$517,034 CJ est. value
Port Wentworth, GA 31407

Islands Expressway at Oatland Island Road Operational Improvements and Resurfacing
Infrastructure
Results
$4,116,205 CJ est. value
Savannah, GA 31410

JC Lewis Ford Dealership
New Construction, Infrastructure
Construction
$12,400,000 CJ est. value
Pooler, GA 31322

CenterPoint Logistics Park
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Garden City, GA 31408

SeaPoint Industrial Terminal Complex
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Savannah, GA 31404

Restoration Hotel
LEED Certification, New Construction, Renovation, Infrastructure - 27,509 SF
Pending Verification
$8,500,000 CJ est. value
Savannah, GA 31401

Parker's Kitchen / Port Wentworth
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Port Wentworth, GA 31407

Last Updated 02/15/2024 07:03 PM
Project Title

Casey Canal Improvements Phase 2A

Physical Address View project details and contacts
City, State (County) Savannah, GA 31401   (Chatham County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $50,921,464 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of the following generally described items: Consists of drainage structure upgrades with this Casey South drainage Basin. Construction will include the addition and size upgrade of pipe and other drainage structures. This construction also consist of roadway demolition, repair and improvements, and detours. Casey Canal Improvements Phase 2A The work to be done consists of the following generally described items: The proposed project is in the residential area located in the vicinity of 54th, 56th and 57th streets between Abercorn to Harmon streets. It will consist of demolition of the existing streets, construction of new stormwater pipes, manholes and inlets, replacement of 8000 ft existing water mains plus laterals and associated valves/accessories, implementation of erosion control, sampling and reporting during construction and restoration of street pavement. The bids are set up in two phases and five options. (Please see attached exhibit) Phase 2-1: construction along 54th street from Abercorn to Harmon and along Abercorn St. from 55th to 54th Phase 2-1, alternative #1: Micro-tunnel 60" RCP for the most eastern block on 54th between Paulsen to Harmon. Phase 2-2: Construction along 57th from Abercorn to Reynolds, along 56th from Reyolds to Harmon, along Abercorn, Habersham, and Battey from 58th to 57 th and along Reynolds from 58th to 56th. Phase 2-2, alternative #1: use 10x6 box culvert in lieu of double 72" RCP for stormwater pipes. Phase 2-2, alternative #2: micro-tunnel 102" RCP for the most eastern block on 56th street between Paulsen to Harmon.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents