Project Title | Internet Parkway Utility Improvements |
Physical Address | View project details and contacts |
City, State (County) | Boardman, OR 97818 (Morrow County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,876,782 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Internet Parkway Utility Improvements bid #07212022 is a supply of materials and labor bid. The type of labor will be installation of ~14,000ft of 24" HDPE potable water pipe, 5 pumps, and manifold equipment for the construction of a pump station and pipeline that will distribute water from a potable water tank. All pipes, pumps, and manifold equipment will be provided by owner. Also included in the bid will be the supply of materials and labor for the construction of a 3,350SF CMU building on concrete foundations to include concrete, rebar, CMU, steel roof joists with steel pan decking, TPO insulated roof, electrical, HVAC, and doors. Port of Morrow will be acting as the General Contractor for this project. Additional Information: Port of Morrow reserves the right to award or reject for good cause, any or all bids, or to postpone the award of the contract upon finding that it is in the public interest to do so. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279a.120. The bidder is subject to all requirements regarding the payment of Prevailing Wage Rates per Public Works Project ORS 279c.800 to 279C.850. Bid Results- 1. Schedule #1 - Tapani Inc. - $ 277,050 2. Schedule #2 - Aden Masonry, Inc - $ 189,900 3. Schedule #3 - Tapani Inc. - $ 872,100 4. Schedule #4 - Columbia Basin Sheet Metal - $66,757 5. Schedule #5 - Tapani Inc. - $ 1,588,580 6. Schedule #6 - Tapani Inc. - $ 706,607 7. Schedule #7 - Columbia River Electric Maintenance, Inc - $ 1,047,908 |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |