Similar Projects
Main Street East Side Sidewalk (I-15 Overpass to Pacific) - City of North Salt Lake
Infrastructure
Conception
$366,200 CJ est. value
North Salt Lake, UT 84054

Main Street East Side Sidewalk (I-15 Overpass to Pacific) - City of North Salt Lake
Infrastructure
Conception
$366,200 CJ est. value
North Salt Lake, UT 84054

Burke Lane Subdivision
New Construction, Infrastructure
Design
$69,000,000 CJ est. value
Farmington, UT 84025

Well Pump Station
Infrastructure
Design
$900,000 CJ est. value
Farmington, UT 84025

Hill Air Force Base Composite Aircraft Antenna Calibration Facility (CAACF)
New Construction, Infrastructure - 32,000 SF
Bidding
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

Hill Air Force Base Composite Aircraft Antenna Calibration Facility (CAACF)
New Construction, Infrastructure - 32,000 SF
Bidding
$100,000,000 CJ est. value
Hill Air Force Base, UT 84056

Clearfield Station Tod Infrastructure Project
Infrastructure
Post-Bid
Clearfield, UT 84015

Damage Repair SR 67 Mp 8.04 Legacy Parkway
Infrastructure
Post-Bid
Centerville, UT 84014

Bonneville Shoreline Design and Construction
Results
UT

District Asphalt Work
Results
Layton, UT

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Station Park North Site Development
New Construction, Alteration
Construction
Farmington, UT 84025

Alta Townhomes & Commercial Development
New Construction, Infrastructure - 9,481 SF
Pending Verification
$17,000,000 CJ est. value
Clearfield, UT 84015

Take 5 Oil Change / Bountiful
New Construction, Infrastructure - 1,400 SF
Pending Verification
$350,000 CJ est. value
Bountiful, UT 84010

Cynthia Way And Dorthea Way - City of North Salt Lake
Infrastructure
Conception
$416,250 CJ est. value
North Salt Lake, UT 84054

Last Updated 02/05/2023 10:35 PM
Project Title

2022 North Canyon Trailhead

Physical Address View project details and contacts
City, State (County) Bountiful, UT 84010   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $455,707 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work of this Construction Contract includes extension of street improvements from the end of an existing street and construction of a trailhead parking facility. Clearing of existing trees and vegetation, installation of utilities, site grading, installation of a reinforced concrete pipe culvert to facilitate access from the existing unimproved road on the north side of the creek to the useable property on the south side of the creek. The work also includes installation of curb, sidewalk, asphalt paving, a detention/retention swale, and landscape restoration.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents